background image

EN

 EN - 3 -

2  Installation procedure

 2.1 

 Step 1: Mechanical installation

  Step 2: Electrical and data

STAND POSITION

Operator side

FRONT OF THE 
FOLLOWSPOT

Please refer to the user's manual for complete instructions :

TILT

PAN

TILT 

sensor

IRIS

sensor

PAN 

sensor

Main display

Backup display

Power In

Connector: Neutrik PowerCON True1
Voltage: 90 

→ 

265V  50/60Hz

Power consumption: 0,5A max.

Power Out

Ethernet 1

Connector: RJ45

Protocol: ANSI E1.31 - 2009 sACN

(Streaming-ACN) PSN PosiStageNet

Ethernet 2

Connector: RJ45

Protocol: ANSI E1.31 - 2009 sACN

(Streaming-ACN) PSN PosiStageNet

Reviews: