ENGLISH
5
Instructions and User Manual
F U S E L A G E
01
ARF
First install the motor on the motor mount by two M3x6
Allen screws. Make sure that the screws are tight and
secure them with screw locking adhesive. A loose motor
can lead to a crash and cause personal injury and damage
to property!
03
ARF
PNP
The rudder and elevator linkage are pre-built. It just has to
be adjusted in its lenght.
05
ARF
Sand the rudder control horn well and glue into the rud-
der by using epoxy resin.
07
ARF
PNP
Connect the ESC to the motor and install it under the
wooden tray in the front by velcro stripe. Check the
running direction of the motor already now and replace if
necessary two of the three cables.
02
ARF
The servos must be placed into the designated wooden
frame by already put in neutral position. The servo arm
has to be fixed in 90° position.
04
ARF
The elevator linkage will be installed and adjusted also at
90° servo position and neutral pivot arm.
Daraus ergibt sich auch die Gesamtlänge des Gestänges.
Lock the linkage with locking nuts.
06
ARF
Then clip the linkage to the servo and rudder horn and
adjust the linkage by the clevis to achieve a neutral rudder
at 90° servo arm. Lock the linkage with locking nuts.
08
ARF
PNP
Make sure the cables are clean and can not drag on the
motor.