background image

Page 1 of 11

4

STAGE

R

O

-MAN

REVERSE OSMOSIS SYSTEM INSTALLATION GUIDE

FOR 400-600 GPD RO SYSTEMS

Standard Installation Kit Contents:

400gpd Reverse Osmosis System

4no Reverse Osmosis Membranes ( Fitted)

3no 700ml Refillable DI filters (Fitted)

Sediment Filter (Fitted)

Carbon Filter (Fitted)

Gac Filter (Fitted)

2 Metres Red Pipe

2 Metres Green Pipe

2 Metres Blue Pipe

¼ straight connector

Saddle Valve Mains ¼”

Roll PTFE Tape

Filter Wrench

Membrane housing wrench

PLEASE READ THIS ENTIRE GUIDE PRIOR TO BEGINNING INSTALLATION

IF AT ANY TIME YOU ARE UNSURE HOW TO PROCEED PLEASE CONTACT THE

SUPPORT TEAM BY EMAILING: [email protected]

This water system has been designed for quick and simple installation and maintenance.

By carefully reading this instruction manual and following the operational guidelines you

will ensure a successful installation and reliable operation.  Routine maintenance is

essential to the longevity and performance of the system.  Filters should be changed every

two to six months depending on the quality of the feed water supply and quantity of water

produced.

!!  CAUTION  !!

DO NOT USE THIS SYSTEM WHERE THE WATER IS MICROBIOLOGICALLY

UNSAFE OR OF UNKNOWN QUALITY.

Summary of Contents for 400-600 GPD RO

Page 1: ...R TO BEGINNING INSTALLATION IF AT ANY TIME YOU ARE UNSURE HOW TO PROCEED PLEASE CONTACT THE SUPPORT TEAM BY EMAILING HELPDESK RO MAN COM This water system has been designed for quick and simple instal...

Page 2: ...ng the Pipes 6 Fitting the Membrane 6 Flushing the Filters 7 Flushing the Membrane 7 Connecting the DI Unit 7 Turning off your RO System 8 RO MAN Options 8 Maintenance 9 The Thin Film Membrane Spec 9...

Page 3: ...he removal of sediments such as dirt sands and rust We do not use a 1 micron filter as we find that they block very easily and this affects the performance of the system Stage 2 Carbon Block Filter Th...

Page 4: ...that the line is completely shut off and the line is drained if no shut off valve is located under the sink turn off the main supply at the entry to the house Before starting to fit the saddle clamp...

Page 5: ...CCB filter housing but do not cut this yet as it will eventually have to be connected to the membrane housing The Blue Pipe This can be connected to the outlet of the DI Unit and the other end to your...

Page 6: ...rn the supply water back on at the saddle valve and allow the system to run until 5 gallons of production water has been produced During this period check the complete system for leaks DO NOT USE THE...

Page 7: ...are two reasons for fitting a pressure gauge 1 To read the water pressure in order to check whether it is within specification System pressure is very important too little pressure will make the produ...

Page 8: ...cartridge from the DI Unit 3 Unscrew the end of the deionization cartridge and remove the foam spacer and discard the resin 4 Refill the cartridge with RO Man DI resin by holding the cartridge upright...

Page 9: ...ble below 2 Divide the rated permeate flow at 77 F by the TFC The result is the permeate flow at the desired temperature Feed Water Temperature Correction C F Factor Feed Water Temperature Correction...

Page 10: ...using is there any water c If the Green line is flowing and the blue is not it may be blocked check the valve at the RO Housing There are two outlets on the out end of the RO membrane One goes to the...

Page 11: ...Page 11 of 11 RO MAN For assistance and enquiries please contact the support team helpdesk ro man com...

Reviews: