Page 1: ... well deck stiffeners step 4 into the appropriate slots At this stage the model should be attached to either a temporary work base step 5 or to the optional display base step 6 This prevents the frame from warping during subsequent steps If using a temporary base apply only a small amount of glue so the ship may be later detached easily Attach the forecastle and poop decks to the frame step 7 The ...
Page 2: ... attach the docking bridge to the stern step 26 The forward cargo hatch breakwater and anchor crane are added in step 27 Step 28 shows a typical funnel assembly Note that the funnels are not identical in size A letter is printed on the connecting strip corresponding with the letter at the funnelís location on the deckhouse roof Also the funnel cap for the aft funnel is different from the other thr...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......