22
•
Chapter 3: Installation & Startup
65-2670XL-XX-07 M2A-XL Transmitter
See Figure 9 below for field wiring connections to the M2A-XL.
2. Re-install the control PCB (and ribbon cable if necessary). Be sure the ribbon cable is routed
down below the control PCB so it will not be damaged by the cover when it is screwed back
on.
3. Secure the M2A-XL junction box cover to the junction box.
4. Make controller, device, and relay connections as appropriate. If shielded cable is used for the
PWR/SIG connections, connect the cable shield’s drain wire to an available chassis ground at
the gas monitoring controller, recording device, or programmable controller.
Start Up
Introducing Incoming Power
1. Complete the installation procedures described earlier in this manual.
2. Verify that all wiring connections are correct and secure.
3. Turn on the incoming power.
4. If necessary, turn on the controller or other monitoring device that is connected to the M2A-
XL.
Figure 9: Wiring the M2A-XL to a Controller and Alarm Devices
+
Alarm Device
Power
-
S
+
PW
R
/SI
G
Fail Alarm
Device
Alarm 1
Alarm Device
Typical Alarm
Wiring Shown
A
B
C
RS
4
8
5
RKI Controller
Terminals
(24 VDC) +
4 - 20 mA In (S)
(24 VDC) -
T
O
X
IC
O
X
Y
See
Modbus
Wiring
See
Detector
Wiring
C
NC
NO
AL
A
R
M
1
C
NC
NO
AL
A
R
M
2
C
NC
NO
FA
IL
Alarm 2
Alarm Device
+