7
1
2
1
2
1
2
2.4 Waste water
2.5 Delivery
2.6 Noise insulation
The whirlpool should be emptied into the public sewage system (see diagram
for he proper connection).
The whirlpool is delivered on a pallet. The whirlpool should be transported to
its destination completely packed, to avoid damage during transporation to
the installation site. Immediately upon arrival the pool should be unpacked
and inspected for any sign of damage.
Attention: Never transport or tilt the Whirlpool on its edge.
When removing the packaging film, make sure that this is only cut in the region of
the transport pallet.
After removing the packaging film, remove the lower cladding elements around
the pool. Allowing access to the base of the pool so that it can be lifted with
straps from the transport pallet and into the final destination.
If the pool is installed next to bedrooms, for example, or any other rooms which
according to DIN 4109 require special noise insulation, additional measures
will have to be taken.
General Information / Requirements
Strato 2.0
1 = Power connection
2 = Water connection
Strato 2.3
Wave 2.0