Riverside Hydronics EMX SERIES Installation & Maintenance Manual Download Page 7

EMX, EMXO and EMXGO SERIES WATER BOILERS 

34-503 07/13 

 

 

7

 

5.  The boiler is equipped with a temperature and pressure relief valve(s) rated for the input. Pipe the relief valve 

discharge to a suitable open drain. The drain pipe may not be smaller than the relief valve opening and must 
be secured to prevent it from lifting out of the drain under discharge pressure. Do not install valves or 
restrictions in the discharge line. 

 

 

6.  Pipe the drain valve to a suitable open drain.

 

 

8 SERVICE 

CLEARANCES 

Allow sufficient space to provide adequate clearances on all sides for service and inspection. Recommended 
clearance is 24” at the top and front, 18” at left and right sides of the appliance.  Optional equipment may increase 
the clearance requirements. Allow sufficient space for installing and servicing connections such as water, gas, 
vent, combustion air, electrical, pump and other auxiliary equipment. 

 

9  CLEARANCES TO COMBUSTIBLE SURFACES 

The appliance must not be installed on a combustible floor, or on a non-combustible floor covering combustible 
material. Clearance to unprotected combustible material must be 8” minimum at top, sides and rear, and 24” 
minimum in front. Recommended access for service is 18” at sides and rear and 24” in front. 

 

10 ELECTRICAL 

WARNING:  Turn off all electrical service to the appliance when accessing the controls located inside 
the control cabinet. The cabinet contains high voltage wiring and terminals. If the electrical service is 
not turned off and these wires or terminals are touched, a dangerous shock causing personal injury or 
loss of life could occur. Close the control cabinet before restoring electrical service to the appliance. 

 

1.  Wiring to the unit should conform to the National Electrical Code or the code legally authorized in your 

locality. A fused disconnect switch should be used for the boiler. When required, EPV boilers are equipped 
with step-down transformers located within the NEMA enclosure. This allows for an effective single point 
electrical connection to the boiler. 
 

2.  Be certain that high and low voltages are connected to the correct points. 

 

3.  When remote on/off or lead-lag enable operation is used, remove jumper from R1 and R2 and wire in 

series.      
 

4.  A proper earth ground for this unit must be provided. A single conductor ground wire pulled from the 

distribution panel to the sub panel (or some similar type) is recommended. 
 

CAUTION: Use only copper wiring of proper sizing for incoming service. Damage resulting from use of 
aluminum wiring will be excluded from coverage under the warranty of this unit. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for EMX SERIES

Page 1: ...ation adjustment alteration service or maintenance can cause property damage personal injury exposure to hazardous materials or loss of life Refer to the information contained in this manual A qualifi...

Page 2: ...ipment Before You Install 4 Warranty 5 Codes 6 Location 7 Installation 8 Service Clearances 9 Clearances to Combustible Surfaces 10 Electrical 11 Venting 12 Combustion Ventilation Air Opening 13 Vent...

Page 3: ...neering controls Use NIOSH MSHA approved respirators as required see MSDS Wear long sleeved loose fitting clothing eye protection and gloves FIRST AID MEASURES If any of the irritations listed persist...

Page 4: ...OR THE PHYSICALLY HANDICAPPED HOSPITALS AND NURSING HOMES ELDER CARE FACILITIES AND REST HOMES ORPHANAGES AND CHILD CARE FACILITIES OTHER INSTALLATIONS WHERE RESPONSE TO CONTACT WITH HOT WATER MAY BE...

Page 5: ...ATURE AND PRESSURE GAUGES 8 3 HANDHOLE CLEANOUT 3 CONTROL ENCLOSURE 9 FLOAT LWCO Optional 4 GAS INLET 10 BOILER WATER RETURN 5 ASME PRESSURE RELIEF VALVE 11 BOILER WATER OUTLET 6 COMBINATION BOTTOM BL...

Page 6: ...iances conform to the latest edition of the ASME Boiler and Pressure Vessel Code Section IV Where required by the authority having jurisdiction the installation must comply with the Canadian Associati...

Page 7: ...ss for service is 18 at sides and rear and 24 in front 10 ELECTRICAL WARNING Turn off all electrical service to the appliance when accessing the controls located inside the control cabinet The cabinet...

Page 8: ...ING Vent this appliance in accordance with the latest edition of the National Fuel Gas Code and in accordance with the authority having jurisdiction See National Fuel Gas Code for complete requirement...

Page 9: ...2 each opening specified above should have a minimum free area of 1 square inch per 1 000 Btu h input CONFINED AREA FIGURE 1 Equipment located in confined spaces all air from outdoors CONFINED AREA F...

Page 10: ...y or death 3 The vent connector must be the same size as the product flue outlet The vent size must be determined by the BTU input of the product s and the vent design The horizontal breeching of a ve...

Page 11: ...uring and after operation Use care to avoid contact with skin while making adjustments 4 Conduct the following gas train leakage test before start up annual intervals and prior to investigating the ca...

Page 12: ...03 07 13 12 Record the following information for future use 1 Manifold gas pressure W C 2 Vent pressure W C 3 O2 reading 5 7 4 CO2 reading 8 9 5 CO reading ppm less than 300 ppm 6 NOx reading ppm 7 Ve...

Page 13: ...1850 3250 6700 125 1020 1650 2950 6000 150 950 1500 2650 5500 175 850 1370 2450 5000 200 800 1280 2280 4600 TABLE 1 Multiplier for Propane 1 57 Multiplier for alternate pressure drops 0 3 W C 0 77 1 0...

Page 14: ...f the pump The pump is a positive displacement type and pumps a constant volume of oil only a portion of which is used by the nozzle s the remainder being bypassed to the return line During gas operat...

Page 15: ...equipment operator Table 3 page 17 Since boiler designs vary only some of these listed inspections may be appropriate for your particular model Proper water treatment is critical to prevent corrosion...

Page 16: ...circuit to stop the burner at the proper point then SHUT DOWN THE BURNER IMMEDIATELY Do not restart until all cross connecting piping is checked for obstructions Also check the float bowl If these ar...

Page 17: ...INSPECTION REPORT DATE BURNER INSPECTION COMBUSTION ANALYSIS TANK INSPECTION TANK FLUSH CLEANOUT PRV TEST INSPECTION VENT INSPECTION THERMOSTAT INSPECTION GAS TRAIN LEAK TEST Recommended Inspection In...

Page 18: ...EMX EMXO and EMXGO SERIES WATER BOILERS 34 503 07 13 18 Riverside Hydronics LLC 990 Haltom Road Ft Worth TX 76117 1 800 990 5918 www riversidehydronics com...

Reviews: