OPERATION 

 

LOW WATER CUTOFF - 

Proper function of the low water cutoffs should be verified every six months. See individual 

boiler Installation & Maintenance manuals for details.

 

 

OPERATING TEMPERATURE CONTROL - 

An adjustable digital operating control, TempTrac

®

,

 is located in the front 

control panel of the PRIMERA

®

 boiler. This control uses a remote sensing bulb mounted in the outlet fitting of the EPV

®

 

boiler. The function of this control is specially designed to coordinate the operation as well a firing rate of both boilers in 
order to match the heat load of the system while maximizing the fuel efficiency. Do not attempt to alter control system 
parameters without factory direction. Improper adjustments could disable operation. 

 

The sequence of control logic could be as follows: 

1.  System heat demand is at a minimum, the EPV

®

 boiler fires at the lowest firing rate, periodically cycling. This 

condition is the most efficient operation. 

2.  System demand increases and the TempTrac

®

 will stage the EPV

®

 boiler between the lowest firing rate and the 

highest firing rate, in order to match heat delivery to system heat demand. This condition continues to operate at 
a high efficiency. 

3.  System heat demand further increases as system approaches peak heat demand. The TempTrac

®

 

now enables 

the 

PRIMERA

®

 

boiler and simultaneously reduces the firing rate of the EPV

®

 boiler to it lowest firing rate. The 

TempTrac

®

 will now modulate the 

PRIMERA

®

 boiler between its lowest and highest firing rate in order to 

precisely match the system heat demand. 

4.  System heat demand now reaches the peak heat demand and the TempTrac

®

 

may now enable the EPV

®

 boiler 

as well. The TempTrac

®

 is able to simultaneously modulate the 

PRIMERA

®

 boiler and stage the EPV

®

 boiler in 

order to respond to this peak demand. 

 

The diagram titled “EMBLEM

®

 Control Logic” illustrates the operation of this system at a set-point of 155°F. 

 

 

To adjust the set point of the TempTrac

®

 to deliver the desired water temperature, press and release the 

Set 

key on the face of 

the control.  Set-point 1 

(St1)

 parameter is the first to be displayed. Press the 

Set

 key again and adjustment is enabled. Use 

the arrow keys to adjust the set-point 1 to the desired system temperature and press the 

set

 key again to lock it in. 

DO NOT 

change the other set-points in this menu. 

 

GENERAL INFORMATION 

 

RELIEF VALVE 

- Both heating boilers are normally supplied with a pressure only relief valve(s) sized in accordance with 

the ASME Boiler and Pressure Vessel Code, Section IV; 150 psig/250 °F maximum. 

 

 

Caution

: Do not install a reducing coupling, valve or other restriction in the relief valve(s) discharge line. The discharge 

line shall allow complete drainage of the valve and line. Relief valves should be manually operated at least once a year. 

 

WARNING: To prevent burns caused by hot water discharge and water damage, the discharge from both relief 
valves must be piped to a suitable floor drain for disposal when relief occurs. Avoid contact with hot discharge 
water. 

 

THERMAL EXPANSION - 

A relief valve that discharges periodically may be due to thermal expansion in a closed 

system. This system must be provided with means to control expansion. Contact a boiler or plumbing professional to 
resolve this situation. Do not plug the relief valve. 

 

AUTOMATIC OVERRIDE SWITCH – 

This 2 position switch is located on the main power disconnect panel. In the event that a 

failure of the electronic temperature control occurs or the 

PRIMERA

®

 boiler is temporarily removed from service, the automatic 

override switch can be set Manual Override, allowing the EPV

®

 boiler to function independently of the EMBLEM

®

 control 

system. 

 

HIGH WATER TEMPERATURE LIMIT CONTROL

 – Both boilers are equipped with adjustable limit and high limit 

controls to control the maximum discharge water temperature. (See: Individual boiler Installation & Maintenance 
manuals for additional details about temperature limits). 

 

WARNING:  Turn off all electrical service to the appliance when accessing the limit or high limit controls located 
inside the electrical enclosures. If the electrical service is not turned off and these terminals are touched, a 
dangerous shock causing personal injury or loss of life could occur

.  

 

 
 
 

 
 

 
 

 

Riverside Hydronics

®

, LLC  -  990 Haltom Road  -  Fort Worth, Texas  76117  -  Tel 1-800-990-5918 

Summary of Contents for Emblem

Page 1: ...structions must be given to the equipment user or left near the appliance Refer to I M documents 34 50 34 501 and 34 502 for additional important information SPECIAL INSTRUCTIONS TO THE OWNER Retain t...

Page 2: ...res are high the EMBLEM system engages a non condensing boiler to supplement heat output Although non condensing the secondary boiler in the EMBLEM system still operates at relatively high efficiency...

Page 3: ...n from the system water to be heated to the Inlet of the EPV boiler Connect the Outlet to the supply side of the system hot water out of the unit FILLING THE UNIT 1 Fill the system with water To be su...

Page 4: ...1 St1 parameter is the first to be displayed Press the Set key again and adjustment is enabled Use the arrow keys to adjust the set point 1 to the desired system temperature and press the set key agai...

Page 5: ...the inherent flexibility of the EMBLEM system The Primary Only System is generally not applied with modern PRIMERA boiler systems due to the need to maintain a constant flow rate through the boiler Th...

Page 6: ...6 Riverside Hydronics LLC 990 Haltom Road Fort Worth Texas 76117 Tel 1 800 990 5918...

Page 7: ...t always the case Untreated make up water is a leading cause for failures of hat water boilers Provisions must be made for properly introducing metering and treating make up water Below are some consi...

Page 8: ...he E series parameters are divided into 10 minute increments The E1 parameter is Sunday The S series parameters are the ending point for the programmed shift in set point The S series parameters are d...

Page 9: ...1 160 E2 0 0 S2 6 0 Sb2 25 LEAD LAG CONTROL OPTION 2 The lead lag and outdoor reset function is managed by a third party Boiler Management System BMS or building Energy Management System EMS This mann...

Page 10: ...ata Function Code Code of the desired function 0X06 Register Address The address of the first register to be read Set point 1 St1 has a register address of 768 Data The data to write CRC Defines the C...

Reviews: