background image

34-500 09/07 

1

 

OPERATING INSTRUCTIONS 

 

EMBLEM

® 

GAS-FIRED MULTIPLE BOILER HEATING SYSTEM 

 

 

Installation and service must be performed by a qualified service installer, service agency or the gas supplier. 

 

THIS MANUAL CONTAINS INFORMATION REQUIRED FOR OPERATION AND MAINTENANCE OF THE EMBLEM

®

 

GAS-FIRED MULTIPLE BOILER HEATING SYSTEM. REFER TO INDIVIDUAL PRIMERA

®

 AND EPV

®

 BOILER 

INSTALLATION AND MAINTENANCE MANUALS FOR INSTRUCTIONS, WARNINGS AND IMPORTANT INFORMATION 
ABOUT THE INSTALLATION, OPERATION AND MAINTENANCE FOR EACH OF THE BOILERS IN THIS HEATING 
SYSTEM. READ AND FOLLOW ALL INSTRUCTIONS, MARKINGS AND WARNINGS BEFORE ATTEMPTING TO 
START AND OPERATE EITHER BOILER. 

 

 

 

TO THE INSTALLER:

  After installation, these instructions must be given to the equipment user or left near the appliance. 

Refer to I & M documents 34-50, 34-501 and 34-502 for additional important information. 

 
SPECIAL INSTRUCTIONS TO THE OWNER:

  Retain this manual for future reference.  These instructions contain 

important information that will help you in maintaining and operating this appliance. 
 

CHECKING EQUIPMENT BEFORE YOU INSTALL

 - Upon receiving equipment, check for signs of shipping damage. 

Inspect the appliance and all accompanying parts for signs of impact or mishandling. Verify the total number of pieces 
shown on packing slips with those actually received. If there is damage or a shortage, contact the carrier immediately. 
 

WARRANTY

 - Factory warranty does not cover improper installation or operation.  (See individual PRIMERA

®

 and EPV

®

 

boiler warranties for complete details).  

 

 

 
 
 
 
 
 
 
 

 

Riverside Hydronics

®

, LLC  -  990 Haltom Road  -  Fort Worth, Texas  76117  -  Tel 1-800-990-5918

 

Summary of Contents for Emblem

Page 1: ...structions must be given to the equipment user or left near the appliance Refer to I M documents 34 50 34 501 and 34 502 for additional important information SPECIAL INSTRUCTIONS TO THE OWNER Retain t...

Page 2: ...res are high the EMBLEM system engages a non condensing boiler to supplement heat output Although non condensing the secondary boiler in the EMBLEM system still operates at relatively high efficiency...

Page 3: ...n from the system water to be heated to the Inlet of the EPV boiler Connect the Outlet to the supply side of the system hot water out of the unit FILLING THE UNIT 1 Fill the system with water To be su...

Page 4: ...1 St1 parameter is the first to be displayed Press the Set key again and adjustment is enabled Use the arrow keys to adjust the set point 1 to the desired system temperature and press the set key agai...

Page 5: ...the inherent flexibility of the EMBLEM system The Primary Only System is generally not applied with modern PRIMERA boiler systems due to the need to maintain a constant flow rate through the boiler Th...

Page 6: ...6 Riverside Hydronics LLC 990 Haltom Road Fort Worth Texas 76117 Tel 1 800 990 5918...

Page 7: ...t always the case Untreated make up water is a leading cause for failures of hat water boilers Provisions must be made for properly introducing metering and treating make up water Below are some consi...

Page 8: ...he E series parameters are divided into 10 minute increments The E1 parameter is Sunday The S series parameters are the ending point for the programmed shift in set point The S series parameters are d...

Page 9: ...1 160 E2 0 0 S2 6 0 Sb2 25 LEAD LAG CONTROL OPTION 2 The lead lag and outdoor reset function is managed by a third party Boiler Management System BMS or building Energy Management System EMS This mann...

Page 10: ...ata Function Code Code of the desired function 0X06 Register Address The address of the first register to be read Set point 1 St1 has a register address of 768 Data The data to write CRC Defines the C...

Reviews: