ASSEMBLE BACK PANEL 

SELECT: 
 

4 x 1.850 m Wall Sheets 
1 x 2.020 m Top Plate (Red) 
1 x 2.020 m Bottom Plate (Green) 
48 x 30mm Galv Clouts 
6 x Rivets 

STEP 1: 
 



Lay out 1 x Top Plate and 1 x Bottom Plate on a 
flat surface as shown (corner cutouts to face in-
wards).  

STEP 2: 
 



Place 4 x 1.850 m wall sheets on top of timber 
Plates with bottom of sheets flush with each oth-
er.  

 



Rivet the sheets together on overlaps as shown

STEP 3: 

 



Nail the wall sheets to the Top Plate at each end making sure 
that the top of the sheets are flush with the top of the Top 
Plate and that the sides of the wall sheets overhang the Top 
Plate by 15mm as shown. 

 



Check that the Top Plate is straight then nail wall sheets to 
the Top Plate, using two clouts per pan.  

STEP 4: 

 



Nail the wall sheets to the Bottom Plate at each end,  

     ensuring that each side of the wall sheets overhangs the                           

Bottom Plate by 15mm and that the distance between  

     the Top and Bottom Plates is correct. (As shown) 
 



Check that the Bottom Plate is straight then nail   

     wall sheets to the Bottom Plate, using two clouts per pan

.

 

BOTTOM PLATE 

1811mm 

1811mm 

TOP PLATE 

1811mm 

TOP PLATE 

15mm 

15mm 

BOTTOM PLATE 

TOP PLATE 

1811mm 

BOTTOM PLATE 

15mm 

15mm 

TOP PLATE 

Std Shed — Bottom Plate will protrude below wall sheet by 
approximately 10mm.  
 
Raised base plate shed — Wall sheet will protrude below 

the Bottom Plate by 20mm

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 
BASE PLATE –READ THE FOLLOWING; 

 

For sheds with Raised Base Plate option only (see page 5), deduct 
30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

Summary of Contents for Duratuf SENTRY SHEDS SG2020

Page 1: ...ASSEMBLY INSTRUCTIONS SG2020 BASE SIZE 2 020m x 2 020m...

Page 2: ......

Page 3: ...EQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above Afte...

Page 4: ...r Jamb 1 850 m 2 Roof 2 200 m 4 Door Brace 1 160 m 2 Door 3 4 Sheet 1 810 m 2 Ridge Flashing 2 055 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 2 020 m 2 Padbolt Support 0 140 m 1 Bott...

Page 5: ...Side Back Wall Sheets Front Wall Sheet Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Ridge Beam Jack Stud Ridge Flashing 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 AS...

Page 6: ...g through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom p...

Page 7: ...flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces ar...

Page 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Page 9: ...e using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the T...

Page 10: ...nges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on timber Ensure that the top of the sheets are flush with the top of the Top Plate and t...

Page 11: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Page 12: ...ce and use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a centr...

Page 13: ...eet then using 1 x 40mm Weatherseal nail fix Roof Sheet through the pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Bea...

Page 14: ...Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Chec...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fasten...

Reviews: