FOUNDATION

 

GARRISON WOODEN FLOOR 

 

 

• 

The optional Garrison kitset wooden floor boards are cut to 
length and designed to be fitted into the shed after the shed is 
assembled.

 

 

 

• 

Assemble shed as per  instructions and fit floor last.

 

          (see page 13 for details). 

 

CONCRETE SLAB FOR RAISED BASE PLATE SHED

 

 

To build a raised concrete slab for your shed to sit on, we recom-

mend the following:

 

 

• 

The raised slab size should be 15mm smaller than the base 
size of the shed and at least 30mm above ground line.

 

 

• 

The slab should be 80mm thick in the middle and 100mm 
thick around the edges.

 

 

• 

The slab should be laid on a solid or compacted base.

 

 

• 

Plastic sheeting under slab will prevent moisture coming 
through from underneath

.

 

 

• 

During construction, you may raise the  bottom timber 
plate to allow the wall cladding to protrude 20mm below 
the bottom plate. This will stop water flowing between 
the bottom plate and the concrete floor. 

 

          

See note on page 8.

 

80mm

 

100mm

 

7.5mm

 

20mm

 

Concrete Floor

 

Base Plate

 

Wall Cladding

 

6

 

RAISED BASE PLATE OPTION

 

(For sheds placed on a raised concrete floor)

 

No doubt by now you will have decided what sort of base you are putting down. 

 

Please read the section that applies to your situation.

 

If you choose to pour a concrete base you will need to decide whether you wish to raise the base plate of your shed. 

This allows the cladding to protrude below the surface of the concrete and ensures a water tight pad. 

 

See concrete pad specifications below.

 

By choosing this option you will need to make the concrete pad to the specification below.

 

Summary of Contents for Duratuf Garrison Sheds PL46

Page 1: ...ASSEMBLY INSTRUCTIONS PL46 BASE SIZE 1 520m x 2 020m...

Page 2: ...CHECK OUT OUR ASSEMBLY VIDEO...

Page 3: ...process needs to be adhered to to qualify for the steel warranty of your Duratuf Garrison shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 4: ...935m 2 Side Wall Angle 1 905m 2 Side Wall Angle 1 875m 2 Roof 2 200m 3 Door Sheet Narrow 1 940m 2 Door Sides 1 940m 2 Door Jamb 1 980m 1 Corner Door Jamb 1 980m 1 Door Brace 1 200m 2 Barge 2 200m 2 S...

Page 5: ...R PACK CHECK LIST INCLUDED IN PACK 2 DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 1 520 m 2 Front Back Top Plate H1 Red 1 520 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top...

Page 6: ...LE SIDE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Top Plate Back Side Wall Sheets Barge Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall...

Page 7: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 8: ...e door as shown ensuring narrow face of flashing is on the front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the...

Page 9: ...p of timber plates with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets ar...

Page 10: ...th bottom of sheets flush with each other Rivet the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with...

Page 11: ...rly Fit remaining rivets STEP 3 Place 1 x Wall Sheet on timber plates Ensure that the top of the sheet is flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plat...

Page 12: ...panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel as shown Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2...

Page 13: ...x rivets per join STEP 2 Position the Roof Sheets with front overhang of 130mm at each end fig 1 Using 4 x 50mm Clouts predrill and nail the Roof Sheets to the Top Plates through the ribs at each corn...

Page 14: ...P REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto D...

Page 15: ......

Page 16: ...cate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fastenings and fixings Normal wear and tear damage by impact o...

Reviews: