CG2053904-RG
Page
11 of 22
20150821-V0
Step 10.
Assembly front shelf assembly to fire bowl(11)
Hardware required: Bolt C x 2 pcs, flange nut D x 2 pcs
Step 11.
Assembly front table support (14) to front table assembly and fire bowl
Hardware required: Bolt C x 4 pcs, flange nut D x 2 pc