CG2053904-RG
Page
10 of 22
20150821-V0
Step 8.
Assembly side shelf 10 to fire bowl (11).
Hardware required: Bolt B x 4pcs, flange nut D x 4 pcs
Step 9.
Assembly front table slats (12) with front table bracket (13) to form front shelf
assembly.
Hardware required: Bolt C x 6 pcs