INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
87 / 130
1.
Clean and lightly roughen the connection
surfaces.
2.
Brush the connection surfaces with a thin layer
on contact grease compound.
3.
Brush the Al elast contact discs with a thick layer
of contact grease compound PFISTERER P1 so the
hollow spaces are filled after installation.
4.
Push the Al elast contact discs between the
connection surfaces onto the bolt shaft.
5.
Brush the bolts with a thin layer of gleitmo 815.
6.
Push the washers onto the bolt shaft.
For force transmission, use stain steel washers with
an outer diameter of 36 mm which are 4 mm thick.
Split lock washers must not be used.
7.
Install the bolted connections as per the
installation drawing.
8.
Tighten the bolted connection with a torque
spanner. When doing so, adhere to the tightening
torque values in Appendix B.
9.
Mark the checked bolts with a red paint pen.
4.8.3
INSTALLATION WITH
CONICAL SPRING WASHER
Also adhere to the installation drawing in the
documentation folder.
The contact grease compound is not suitable for
greasing bolts. For greasing bolts, use high-
performance grease compound "gleitmo 815".
Personnel:
Installation Staff
Protective Equipment:
Occupational Safety Clothing
Protective Gloves
Safety Footwear
1.
Clean and lightly roughen the connection
surfaces.
2.
Brush the connection surfaces with a thin layer
on contact grease compound.
The connection surfaces are bolted directly to one
another (e. g. copper on copper or aluminium on
aluminium).