INSTALLATION INSTRUCTIONS
(No Hydraulic Leveler Present in Pit)
1.
Install VBR6 insert (if removed during pit work) and
tighten (6 ea.) nylock nuts on back face and (2 ea.)
jam nuts on base. See figure 2
2.
Install hydraulic dock leveler per dock leveler
installation instructions.
3.
Manually raise and strut dock leveler.
HYDRAULIC CYLINDER SUPPORT
(Dock Leveler)
4.
If the base clevis of the hydraulic cylinder on the
dock leveler is over the opening of the Dok-Lok,
cylinder support must be placed centered on
cylinder clevis and shimmed to support hydraulic
dock leveler. See figure 3.
5.
If the base clevis of the hydraulic cylinder on the
dock leveler is not over the opening of the Dok-Lok,
cylinder clevis needs to be shimmed to pit floor to
support hydraulic dock leveler.
6.
Route Dok-Lok hydraulic hoses thru the back
opening of the Dok-Lok pit. See figure 4.
INSTALLATION
Dock Leveler
Cylinder Clevis
Shim from top of
cylinder support
to underside of
cylinder clevis
Leveler
Pit Floor
1" Approx.
FIGURE 3 - CYLINDER SUPPORT
Pub. No. 1327 — January 2014
5
RITE-HITE
®
VBR-600 DOK-LOK
®
Installation Manual
VBR-600 Insert
Assembly
3/16”-16 Bolt w/Jam Nut, Qty (2)
Torque To 200 In-Lbs (17 Ft-Lbs)
Ensure Tabs On Insert Are Under Tabs In Pan As Shown
And Install And Tighten (2) Bolts With Jams Nuts.
This Bolt May Need
To Be Removed To
Improve Access
Install And Torque (6)
Nylock Nuts Securing
Insert To Pan.
Torque To 260 Ft-Lbs
FIGURE 2 - PLACEMENT