C. 

 

Riser Tube

  –  Install a riser tube (#4) around pipe to provide room for plumbing and to accommodate 

optional shut-off valve. Ensure that the water supply line is centered in the riser tube. Do not add any insulation in 

the riser tube, as it provides a path for frost. For optimum water line protection, use the 12” outside diameter 

insulated Ritchie Thermal Tube. Use whatever combination of Thermal  Tubes is required to reach at least 1' 

below frost line.  

Ritchie Thermal Tubes 

18158 - 1’ top section 

16612 - 4’ top section 

16417 - 2’ top section 

16416 - 2’ extension 

NOTE:

 

The supply line touching the riser tube is the most common cause of the supply line freezing. 

Do not surround the supply line with insulation, wood, or other foreign material. Any foreign material in 

the tube may cause frost to migrate to the supply line causing it to freeze.

 

D. 

 

Electrical Connection

 

(Optional)  –

  Although  WaterMaster fountains will not require supplemental heat 

when using constant flow, there are circumstances where supplemental heat may be required. If electricity is 

available, it is a good management decision to run the electrical line for future use in the event your operation 

changes and you choose not to constant flow.  

WARNING:  ANY ELECTRICAL SERVICE MUST BE INSTALLED AND MAINTAINED BY A 

QUALIFIED ELECTRICIAN IN COMPLIANCE WITH LOCAL CODES.

  

E. 

 

Mounting Platform – 

A concrete platform should be provided for all fountains. It should be at least 4” thick 

and large enough to accommodate fountain. An additional 4” high step 18” out from each side of the unit will 

protect the unit from manure handling equipment, as well as discouraging animals from defecating in the 

fountain. Extending the platform provides animals a place to stand while drinking, consider the size of your 

animals when determining the dimensions of your platform. Slope the platform away from the fountain for 

drainage. A rough broom finish on the concrete surface provides better footing for animals.  

F. 

 

Preparing the Bottom

 - Apply the foam weather stripping to the bottom of the unit, around the outside edge 

of the fountain.  

G. 

 

Position Fountain

 - Connect hose to the top of the supply line, or the customer supplied shutoff valve at the 

top of the concrete. Place fountain on the concrete platform over the riser tube so the supply hose is centered in 

riser tube. Set the fountain on the concrete pad to inspect positioning of the installation. Once all connections are 

lined up, marking anchor bolt location can easily be done with a drill. 

NOTE:

 

Take this opportunity to check to see that the constant flow drain will align properly with the 

drainpipe in the ground. (Some replacement installations may require additional fittings and elbows.)  

 

 

 

 

WaterMaster Series Instruction Manual

2

31 August, 2019

Summary of Contents for WaterMaster Series

Page 1: ...watering fountain on the market This unit is built to give you excellent service when properly installed and maintained Please follow instructions carefully Read and understand all instructions before...

Page 2: ...ply line enters the fountain should be opposite of prevailing winter wind to give additional protection to the supply line B Water Supply Line The horizontal underground water line 1 should be sized t...

Page 3: ...QUALIFIED ELECTRICIAN IN COMPLIANCE WITH LOCAL CODES E Mounting Platform A concrete platform should be provided for all fountains It should be at least 4 thick and large enough to accommodate fountain...

Page 4: ...t second pin 6 For constant flow trainer tube options Drill a 1 8 hole in the threaded boss in the side of the yellow valve body Attach petcock valve with thread sealant J Valve Mounting After fountai...

Page 5: ...l against air infiltration before assembling Drop in the valve chamber cover Note Serial number or date code is found on underneath side of top red valve cover Tip You may use vegetable oil to fill th...

Page 6: ...e supply line down into the riser tube You may use nylon ties to anchor the cable to the supply line Both immersion heaters and supply line heaters are thermostatically controlled using power only whe...

Page 7: ...nel Rnd Hardware pkg 2 pkgs NS 18632 Cap for Trainer Hole 1 pkg 6 16464 Valve WM Assembly pkg 1 pkg NS 17173 Adapter 3 PVC 1 7 18314 Float with Hardware pkg 1 pkg NS 15931 Hose Clamp 1 SS 5 pkg 1 pkg...

Page 8: ...14866 Seal Foam 10 Roll 2 6 16464 Valve WM Asssembly pkg 1 pkg NS 18632 Cap for Trainer Hole 1 pkg 7 18314 Float with Hardware pkg 1 pkg NS 17173 Adapter 3 PVC 1 18313 Hardware for Float pkg 1 pkg NS...

Page 9: ...4 pkg 1 6 15377 Green Valve 3 4 Male pkg 1 pkg NS 14866 Seal Foam 10 Roll 2 7 18838 VLV HP Brkt Assy pkg 1 NS 18632 Cap for Trainer Hole 1 pkg 8 18314 Float with Hardware pkg 1 pkg NS 17173 Adapter 3...

Page 10: ...Panel Rnd Hardware pkg 2 pkgs NS 18632 Cap for Trainer Hole 1 pkg 6 16464 Valve WM Assembly pkg 1 pkg NS 17173 Adapter 3 PVC 1 7 18314 Float with Hardware pkg 1 pkg NS 15931 Hose Clamp 1 SS 5 pkg 1 p...

Page 11: ...are pkg 1 pkg NS 14866 Seal Foam 10 Roll 2 6 16464 Valve WM Assembly pkg 1 pkg NS 18632 Cap for Trainer Hole 1 pkg 7 18314 Float with Hardware pkg 1 pkg NS 17173 Adapter 3 PVC 1 18313 Hardware for Flo...

Page 12: ...18475 O Ring Valve Seal Pkg 4 pkg 1 6 15377 Green Valve 3 4 Male pkg 1 pkg NS 14866 Seal Foam 10 Roll 3 7 18838 VLV HP Brkt Assy pkg 1 NS 18632 Cap for Trainer Hole 1 pkg 8 18314 Float with Hardware...

Page 13: ...nty Effective September 2012 Ritchie Industries Inc warrants its products to be free of defective materials and workmanship Defective part s will be repaired or replaced at the option of Ritchie Indus...

Reviews: