
3
1. Safety Features and Precautions ...................
2. Initial Start-up ...................................................
3. Selecting Measuring Functions & Ranges ....
3.1 Measuring Function Selection............................
3.2 Automatic Measuring Range Selection..............
3.3 Manual Measuring Range Selection..................
4. Liquid Crystal Display ....................................
4.1 Digital Display ...................................................
4.2 Display with Backlit .............................
5.0 Buzzer ..............................................................
6.0 Measurement Value Storage “ HOLD“............
7.0 REL - Relative value measurement ...............
8.0 Voltage Measurement .....................................
9.0 Current Measurement ....................................
4
6
7
7
8
8
9
9
9
10
10
10
11
12
10.0 Diode Testing & Continuity Measurement ....
10.1 Diode Testing ....................................................
10.2 Continuity Testing .............................................
11.0 Resistance Measurement ...............................
12.0 Capacitance Measurement ............................
13.0 Frequency & Duty cycle Measurement ........
13.1 Frequency Measurement .................................
13.2 Duty Cycle Measurement .................................
14.0 Temperature Measurement ............................
16.0 Specifications .................................................
17.0 Maintenance ....................................................
17.1 Battery ..............................................................
17.2 Housing .............................................................
18.0 Repair and Replacement parts service .........
15
15
16
16
17
19
19
19
20
21
26
26
27
27
15.0 Non contact voltage (NCV) detection..............
20
Summary of Contents for Clamp ES1000AC
Page 2: ......
Page 6: ...1000 V 4 digital clamp meter clamp meter...
Page 8: ...6 17 1...
Page 10: ...AC 8 This clamp meter...
Page 13: ...11 DC...
Page 17: ...15 OL 10 Diode Testing Continuity Measurement 10 1 Diode Testing...
Page 18: ...11 Resistance Measurement 16 10 2 Continuity Testing...
Page 20: ...18 Clearing Zero adjustment or Switch the Clamp meter off...
Page 25: ...3 52 23 38 60 Hz Environmental conditions Altitude up to...
Page 31: ......