12 - rev.00
10 - Before inserting the bollard into its housing, remove the previously
placed closing or cover making sure that the anchorage housing of the
bollard, represented by the grey area, is cleaned carefully.
See figures alongside.
9 - After positioning the case,
make sure that the open recess is cov-
ered
, for the entire amount of time that the rising bollard is not inserted,
with covering that is suitable to avoid accidents that may involve per-
sons or property
. A sheet metal cover is available as an option.
See figures alongside.
11 - Plan for a junction box in proximity (max 2/3m) of the bollard (Ref. S),
where about 1m of extra cable should be left. While inserting the bollard,
thanks to this junction box it will be possible to recover/release the cable
When laying the conduit, try to keep the path as straight as possible,
avoiding sharp corners.
The maximum distance between the control panel CP.1/2/4/S/K and
the bollard cannot exceed 25m
See figures alongside.
S
GB
Assembly instructions
Summary of Contents for Vigilant 500/I
Page 2: ...2 rev 00 ...
Page 23: ......