background image

Rise Ticker Hardware Install Guide

www.RiseDisplay.com

Summary of Contents for Ticker

Page 1: ...Rise Ticker Hardware Install Guide www RiseDisplay com ...

Page 2: ...onnecting Sections 7 Installing Corners 9 Network Connectivity 9 Troubleshooting 11 Tools Required Cordless drill with phillips bit 1 2 Standard set of drill bits 3 8 nut driver Torpedo Level Chalk line or a laser level if possible Tape measure Technical Specifications 32 Pixel 4mm 48 Pixel 4mm 64 Pixel 4mm 32 Pixel 6mm 48 Pixel 6mm 64 Pixel 6mm support risedisplay com 1 ...

Page 3: ...ETL Certification support risedisplay com 2 ...

Page 4: ...s 2 Screw Wall Brackets vertically into wall studs or use Anchors drywall plugs using a minimum of two inch screws 3 Attach the Sign Bracket onto the top frame via the caged nuts located in the top frame itself there will be 4 caged nuts 2 nuts per Sign Bracket support risedisplay com 3 ...

Page 5: ...to the top frame via the caged nuts located in the top frame Slide along the top of the ticker top to position the brackets then tighten there will be 4 caged nuts 2 nuts per Sign Bracket 2 Attach a chain or aircraft cable to the bracket support risedisplay com 4 ...

Page 6: ...located in the top frame slide along the top of the ticker top position the brackets there will be 4 caged nuts 2 nuts per Sign Bracket 2 Attach the triangle shaped bracket to the ceiling 3 Connect the two metal brackets together with the two nut bolt washer sets support risedisplay com 5 ...

Page 7: ...PT female adapter shown below onto the NPT support male do not fully tighten NPT support not included 2 Lift the ticker section and slide to align the cage nuts inside the channel on the top of the ticker with the adapter support risedisplay com 6 ...

Page 8: ...IFI data receiver It should be positioned at the far right starting point 2 Remove the module on both ends of each section Insert the handle into the top between the chassis and module make sure the spring is facing the module and pull out The module is fixed by five magnets attached to the frame at the top and after loosening you can lift the module out of the track holding the bottom in place 3 ...

Page 9: ... tightly together eliminating any seam thread in and tighten 4 bolts on top and bottom of the cabinet to secure in place 6 Repeat the above steps until all sections are connected 7 Plug the AC power cable into the port on the back of Sign Once the power cable is plugged in the right direction it will be locked in place support risedisplay com 8 ...

Page 10: ...u are using a wired connection plug your Cat5 cable to the RJ45 port see photo in step 7 on the previous page If you ordered a twin ticker there will be one RJ45 port on the right side and one on the left side 2 For a wireless connection once the sign is turned on with either a Smartphone or PC Laptop that can detect wireless networks follow these steps a Check available wireless networks locate a...

Page 11: ...less network and enter the associated password and click submit f After you see the confirmation screen your ticker has successfully connected and you can exit your browser 3 Ensure your network firewall is set up to allow Outbound TCP IP communication to cms risedisplay com via port 9090 More details check out the Rise Ticker App User Guide 4 To update your content and control the scroll speed an...

Page 12: ... seconds then reconnect power and wait 60 seconds to see if the content updates Then check your Rise Ticker App to see if the ticker shows online if it is showing red go to a device connected to the same network and type 192 168 0 1 in the address bar and log in with Username admin Password PASSWORD Navigate to the Interface wlan0 menu item and see if the Connection State is Connected If it says d...

Reviews: