10
Rion GH30 Greenhouse Assembly Instructions
Assemble the Roof Pediments
Sliding Door Pediment
Assemble all parts of the sliding door pediment except for the 7A connector and the R3 profile.
Slide the PN6 panel into the open space of the pediment.
Note:
The outside surface of the panels have special UV protection, indicated by the logo and the plastic
identification strip. Remove plastic ID strips when as panels are locked in place.
Complete the sliding door pediment with the 7A connector and the R3 profile, taking advantage of the
flexibility of the profiles.
Place the Door11 sliding track into the channels of the bottom of the door pediment according to the side to
which you want the door to open. Tighten with the included AS80 screws and wing nuts through the
connectors.
Lock the pediment in place using pins and remove the ID strips from the panel.
Hinged Door Pediment
Assemble all parts of
the hinged door
pediment except for
the 7A connector and
the R3 profile.
Slide the PN6 panel
into the open space of
the pediment.
Note:
The outside
surface of the panels
have special UV
protection, indicated by
the logo and the plastic
identification strip.
Remove plastic ID strips
when as panels are
locked in place.
Complete the hinged
door pediment with the 7A connector and the R3 profile, taking advantage of the flexibility of the profiles.
Attach the Door21 upper door lintel. Tighten with the included AS80 screws and wing nuts through the
connectors.
Lock the pediment in place using pins and remove the ID strips from the panel.
Summary of Contents for GH30
Page 2: ...2003 Rion Ltd...
Page 27: ...25 Notes...