![Rinnai TRC02i Installation Manual Download Page 34](http://html.mh-extra.com/html/rinnai/trc02i/trc02i_installation-manual_1463156034.webp)
34
Rinnai Rack Installation
Securing Wall Mount Racks (ILW)
•
Identify the installation location and confirm that the installation will meet all required clearances.
•
The size and embedment specified are for anchors installed in stone or aggregate concrete only, for other
anchorage details the contractor or engineer on record for the building shall consult with a licensed structural
engineer for all anchorage of equipment not called out in this manual.
•
In the event of a conflict or inconsistency between items indicated in this manual regarding code requirements,
the more stringent standard shall prevail.
TRS02ILW, TRS03ILW, & TRS23ILW
•
Using the holes in the wall bracket, Securely attach the rack to the wall. Ensure that the attachment strength is
sufficient.
•
Reference local codes regarding minimum concrete thickness and use appropriate expansion anchors that is
capable supporting the TRS weight .
WALL RACK MODELS AVAILABLE
THE WALL MUST BE CABABLE OF CARRYING THE OPERATING WEIGHT OF THE
INSTALLED TRS SYSTEM. CONSULT A STRUCTURAL ENGINEER FOR STRUCTURAL
ANALYSIS OF THE WALL AND APPROPRIATE HANGING METHODS BEFORE ATTEMPTING TO HANG THE
TRS SYSTEM. FAILURE TO COMPLY WITH THE ABOVE REQUIREMENT COULD RESULT IN SUBSTANTIAL
PROPERTY DAMAGE, SEVERE PERSONAL INJURY OR DEATH.
WARNING
TRS03ILW
TRS02ILW
(Brackets are located
on both sides of rack)
TRS23ILW
Summary of Contents for TRC02i
Page 38: ...38 Rinnai Rack Installation ...