16
INSTALLATION / COMMISSIONING CHECKLIST
(To be completed by certified Gas Installer)
Model:
____________________
1. Was a fireplace inspection carried out?
(ie. clearances, combustibles etc.)
2. Was chimney inspected?
3. Did chimney require flue liner system to be installed?
If NO, did chimney meet specified criteria as per manual?
4. Has specified gas pressure been set?
5. Are decorative logs located correctly on pins?
6. Have ember granules been placed and free of dust and powder?
7. Has appliance been sealed around the fireplace?
8. Has the appliance been commissioned?
9. Is the end-user fully aware of operating procedure?
NO
YES
INSTALLER / GASFITTER DETAILS
Company Name:
____________________________________________________________________
Gasfitters Name:
____________________________________________________________________
Address
:
____________________________________________________________________________
____________________________________________________________________________
Phone:
__________________________
Mobile:
____________________________
Certificate of Compliance / Certification Number:
______________________________________
Signed:
_________________________________
Date:
______________________________
Part Number 7567
Summary of Contents for Royale ETR Freestanding
Page 15: ...WIRING DIAGRAM 15 ...