HEATER ENGINE INSTALLATION - ZERO CLEARANCE
ZERO CLEARANCE INSTALLATION OVERVIEW
ZERO CLEARANCE INSTALLATION - DETAIL
Step 1.
Prepare Site
Step 2.
Assemble Zero Clearance Box
Carefully remove the contents from the carton and check to ensure you have all contents as listed on “BEFORE
YOU START” on page 1. If
ANY
damage is evident or parts are missing
DO NOT
assemble the zero clearance box
and contact your supplier for advice.
I.
Assemble the transition box
&
with five screws
(supplied)
, then a
ttach the guide plate
to the transition
box and secure with two pop-rivets (supplied).
Fit the plastic grommet
into the gas and electrical access hole of back panel
.
II.
Attach the two side panels
&
to the back panel
and secure with six screws (suppled).
III.
Attach top panel
to the back panel
aligning the flue outlet hole to the rear and secure with three screws
(supplied).
Next secure the top panel
to the side panels
&
with four screws (supplied).
Attach base panel
to the back panel
and secure with two screws (supplied).
Then secure the base panel
to the side panels
&
with four screws (supplied).
Ensure flue has been installed as per ‘Flueing Installation Manual For Rinnai Flamefire Heaters’.
Read this manual thoroughly and gain a full understanding of the requirements before
undertaking installation.
Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1.
Prepare Site - p.20
Step 2.
Assemble Zero Clearance Box - p.20
Step 3.
Fitting Zero Clearance Box Into Cavity - p.21
Step 4.
Unpack The Heater Engine - p.21
Step 5.
Preparing Heater Engine - p.21
Step 6.
Connect Transition Box to Engine - p.22
Step 7.
Positioning the Heater Engine - p.22
Step 8.
Connect Electrical Supply - p.22
Step 9.
Insert Heater Engine Into Fireplace - p.22
Step 10. Connect Flue - p.22
Step 11. Secure Flue - p.22
Step 12. Connecting Gas - p.22
Step 13. Securing The Heater Engine - p.22
Step 14. Leak Testing - p.22
Step 15. Completing Heater Installation - p.22
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
“ENCLOSURE REQUIREMENTS” on page 14 and that gas and electrical supplies have been
prepared in accordance with the dimensions stipulated in “GAS SUPPLY” on page 15 and
“ELECTRICAL SUPPLY” on page 15.
Ensure there are no wall studs, noggins, ceiling joists, wiring or other obstruction within the wall
and or ceiling cavity where the flue is proposed to penetrate.
Flue guide rails screws and pop rivets are supplied with Zero Clearance kit, part number R2520.
IMPORTANT
IMPORTANT
I
C
A
D
E
B
II
F
D
G
F
I
G
H
III
M
Guide Rails
used in Step 5.
Transition Box
assembly used
in step 6.
A
B
C
E
D
F
G
C
H
D
H
F
G
I
D
I
F
G
NOTE