32
UK FLUE REQUIREMENTS - INSTALLING
The Rinnai Infinity 16i is for internal installation in conjunction with the Rinnai flue
system
The flue must be installed in accordance with:
Manufacturers Installation Instructions
British Standards including BS5440
Gas Safety (Installation and Use) Regulations
IGE/UP/10 Part1 Edition 2.
Building Regulation J
Such other specifications and regulations that may supersede or complement the above
documents.
The flue must be installed by a competent, authorised person. It is the installer’s
responsibility to ensure that the unit has been installed to all current
requirements.
Location of the appliance flue terminal must be in accordance with the clearances shown
in BS5440-1:2000. Table and Figure C.1 is provided for your guidance on page 33.
When multiple room sealed forced draught terminals are installed together there must be
enough of a gap to satisfy the requirements of the regulations. Under current
regulations the terminals must have at least a 300mm gap between them. The flue
terminal should be over 2m from ground level whenever possible. For lower installations
a terminal guard must be installed.
Summary of Contents for Infinity 16 i
Page 2: ...2...
Page 8: ......
Page 13: ......
Page 21: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 41: ...41 DIMENSIONS...
Page 43: ...43 FLOW CHART...
Page 44: ...44 WIRING DIAGRAM...
Page 46: ...46 LETTER OF COMPLIANCE...
Page 47: ...47 CE CERTIFICATE...