![Rinnai Infinity 11e Service Manual Download Page 12](http://html1.mh-extra.com/html/rinnai/infinity-11e/infinity-11e_service-manual_1463044012.webp)
12
TEMPERATURE CONTROLS - OPERATING
Using 2 or more Universal Temperature Controllers.
Switching the system ON.
The hot water system and all controllers can be switched ON
and OFF from any controller by pressing the
ON/OFF
button as
shown. When the system is turned ON the water temperature
display will be lit.
During normal operation the system is left ON. Do not push the
ON/OFF
button when water is running.
Using hot water.
Ensure the system is switched
On
by verifying the temperature
display is lit. Ensure the local controller has priority by verifying
the
Transfer
LED indicator is lit. If it is not then press the
Transfer
button once. This gives the local controller priority of
temperature over the system.
Select the desired temperature using the
Hot water temp.
buttons. The selected temperature will be displayed on all
controller displays. This is the water temperature which will be
supplied from the heater.
Bathroom
temperatures
should be no more than 50°C.
Open the hot water tap. The
appliance will be activated and
the
In Use
indicator will be lit.
Using 4 Universal Temperature Controllers.
You will need to activate the fourth controller.
STEP 1:
On the Master controller press and hold the
Transfer
and
ON/OFF
buttons simultaneously (see Fig. 2)
until a “beep” is heard (approx. 5 seconds).
STEP 2:
Check that the display on all Four controllers is
lit and displaying a temperature when switched on. If any
ONE of the controllers displays two dashes (see Fig. 1) in
the display repeat STEP 1.
If the master controller is replaced, repeat
STEP 1 above for the new controller.
NOTE
Fig. 1
Fig. 2
Summary of Contents for Infinity 11e
Page 2: ...2 c...
Page 3: ...3 June 2010 Issue 1 This manual is intended for use by Gas Safe Regisetred Engineers...
Page 5: ...5 Glossary of Terms and Symbols...
Page 6: ...6 Introduction...
Page 7: ...7 Specification...
Page 8: ...8 Specification...
Page 9: ...9 Water Flow Rates and Pressures...
Page 10: ...10 Dimensions...
Page 11: ...11 Remote Controls...
Page 14: ...14 Cutaway Diagram...
Page 15: ...15 Cutaway Diagram...
Page 16: ...16 Operational Flow Chart...
Page 17: ...17 Main Components...
Page 18: ...18 Main Components...
Page 19: ...19 Wiring Diagrams...
Page 20: ...20 Dip Switch Settings...
Page 21: ...21 Error Codes...
Page 22: ...22 Diagnostic Points...
Page 23: ...23 Gas Pressure Setting...
Page 24: ...24 Gas Pressure Settings...
Page 25: ...25 Servicing Burner...
Page 28: ...28 Spares...
Page 29: ...29 Spares...
Page 30: ...30 Spares...
Page 31: ...31 Spares...
Page 32: ...32 Spares...
Page 33: ...33 Spares...
Page 34: ...34 Spares...
Page 35: ...35 U K Warranty...
Page 36: ...36 U K Contact Ver 1 19 10 21 RUK Tech Dept Ian Jenkins...