background image

 

7

Rinnai New Zealand

Infi nity Solar 20 & 24 Op / Install: 02-08

Accessories

Recess Box

When installing a Rinnai Infi nity continuous fl ow hot water heater in a new home or renovation, 

it is a great idea to allow for a recess box to be included at the construction stage. These boxes 

allow you to literally recess the appliance into the cavity of the wall saving precious space. In 

addition they virtually hide your hot water system altogether.

All boxes and covers are suitable for painting to blend in with the exterior of your home.

Pipe Cover

Pipe covers are recommended as the fi nishing touch to a Rinnai Infi nity continuous fl ow hot 

water heater installation. Basically the covers are designed to hide the plumbing pipework and 

valves. These are particularly popular in installations where the unit is permanently visible to 

the occupants of the house. The cover can be easily attached to the appliance and two pipe 

covers can be joined together for longer pipework if necessary.

Security Bracket

Prevent theft by securing your Rinnai continuous fl ow hot water heater with our custom 

security bracket, easily installed it covers the lower mounting bracket of the appliance to 

create a tamper proof installation.

Sideways Flue Diverter

Designed to redirect fl ue products when the water heater is installed on a balcony, this product 

is available for selected models only.

Contact Rinnai for further information about our accessory range and model suitability details.

Summary of Contents for Infi nity Solar 20

Page 1: ...n Instructions please refer to generic Operation Installation manual also included with product Current AS NZS 3000 AS NZS 3500 NZS 5261 Local Regulations and Municipal Building Codes This appliance m...

Page 2: ...appliance produces very hot water at 75o C and is not suitable for use with remote controllers The household hot water supply MUST be protected by a suitable tempering valve ALWAYS Test the temperatur...

Page 3: ...C Water is then tempered back to 55o C before use Please see the drawing above This is particularly important where the installation is for older or infirm persons or it is in a holiday home or other...

Page 4: ...e Ignition is electronic so there is no pilot light When the hot water tap is off no gas is used Operating noise level is very low Important Information Always check the water temperature carefully be...

Page 5: ...damaged during or after installation or has been subjected to damage or abuse beyond that expected from conditions of normal use Warranty claims may be invalid if not accompanied by details of the ins...

Page 6: ...perature limitations to areas primarily used for personal hygiene Refer to the above mentioned publications for more information A pouch behind the front cover of the continuous flow models REU VE2015...

Page 7: ...water heater installation Basically the covers are designed to hide the plumbing pipework and valves These are particularly popular in installations where the unit is permanently visible to the occup...

Page 8: ...RINNAI 0800 86 746 624 Rinnai New Zealand Limited 105 Pavillion Drive Airport Oaks PO Box 53177 Mangere Airport Retail Centre Manukau Manukau 2150 Phone 09 257 3800 Fax 09 257 3899 Email info rinnai c...

Reviews: