Rinnai Australia
16
Operation & Installation Manual
COMMISSIONING CHECK LIST
FINAL CHECKLIST
(To be completed by Certified Gas Installer)
Yes
/
No
1. Is the appliance positioned in a suitable location (clearances, combustible
clearances windows and surrounds etc)?
2. Gas pressure checked and set?
3. Appliance tested for correct operation and to ensure no gas leaks?
4. Is the end-user fully aware of operating procedure?
5. Customer instructed on operating procedure and safety requirements?
6. Gas Supply pipe is purged of foreign matter before connection?
Installation Date:
Installer’s Name:
Licence Number: