Rinnai Demand Rapid DD1200E315L Owner And Installer Manual Download Page 20

 

 20

   |   Demand Rapid owner & installer guide 12949-B 02-19

Limited Warranty

Rinnai Demand Rapid

All terms of the warranty, subject to the conditions below, are effective from the date of first 

installation. The attending service person reserves the right to verify this by requesting a copy of 

the gas certificate of compliance prior to commencement of any warranty work. Proof of purchase 

and installation date will be required at the time of any warranty claim.

Component

Heat exchanger

All other parts

Parts

Labour

Parts

Labour

Rinnai INFINITY

 

5000 hours or 

three years*

1500 hours or 

one year*

1500 hours or 

one year*

1500 hours or 

one year*

* Whichever comes first

Component

Parts

Labour

Cylinder

Five years

One year

Pump

Two years

One year

Thermostat, controls, valves, pipework One year

One year

For commercial applications, the water heating system must be sized and installed to written 

guidelines from Rinnai.

General warranty terms

Rinnai reserves the right to make modifications and change specifications and its parts without 

notice.

For the purposes of the Consumer Guarantees Act 1993, Rinnai only guarantees the availability of 

repair facilities and spare parts for the express warranty period recorded in the table above.

This warranty does not limit any consumer rights or guarantees that may apply under the 

Consumer Guarantees Act 1993. If the product is being acquired for the purposes of a business, 

the provisions of the Consumer Guarantees Act 1993 do not apply and no other warranties (either 

express or implied by law) apart from those stated in the warranty will apply.

Warranty terms and conditions

1.  All terms of the warranty are effective from the date of first installation. The attending service 

person reserves the right to verify this by requesting a copy of the gas certificate of compliance 

prior to commencement of any warranty work. The installer must issue a certificate of 

compliance by law in New Zealand.  Warranty claims may be invalid if not accompanied by 

details of the installing or supervising gasfitter’s registration number and the gas certification 

number. 

2.  All Rinnai hot water systems must be installed, commissioned, serviced, repaired and removed 

in accordance with the manufacturer’s installation instructions, local regulations, and building 

codes by persons authorised by local regulations to do so. 

3.  All Rinnai hot water systems must be operated and maintained in accordance with the 

manufacturer’s operating instructions. 

4.  Servicing of the system is to be carried out by a Rinnai authorised service centre.

Summary of Contents for Demand Rapid DD1200E315L

Page 1: ...y storage system Owner and installer guide Models DD1200E315N L DD1200i315N L DD1212E315N L DD1212i315N L DD1250E315N L Installer Please leave this guide with the owner as it contains important safety...

Page 2: ...d by an authorised person being in New Zealand a licensed gasfitter Warning Improper installation adjustment alteration service and maintenance can cause property damage personal injury or loss of lif...

Page 3: ...ummary 9 DD1200E315 specification 10 DD1200i315 specification 11 DD1212E315 specification 12 DD1212i315 specification 13 DD1250E315 specification 14 Location 15 General installation information 16 Del...

Page 4: ...o not block or seal the valve s or drain pipe s The system must not be operated unless these devices are fitted and are in good working order Rinnai INFINITY safety devices flame failure boil dry prot...

Page 5: ...uired whenever the appliance is connected to the power supply If power has failed and there is risk of damage from frost turn off the gas supply to the unit and open a tap slightly to allow flow throu...

Page 6: ...ths may result in the water heater exploding Continuous leaking of water from the valve s may indicate a problem It is important that you raise and lower the easing gear gently During operation if the...

Page 7: ...4 Thermal fuse and or OH switch activated Unit operates then stops Owner Service call Installer Check thermal fuse and OH switch If either are faulty check the heater for damage confirm gas type press...

Page 8: ...operation errors are not covered by the Rinnai warranty Troubleshooting general system troubleshooting What s happening Possible cause Explanation and or possible solution Delivery temperature not ho...

Page 9: ...residential applications where a large quantity of hot water is required quickly but there is recovery time available before next use For example filling a machine or spa bath Hard or aggressive water...

Page 10: ...MJ h Output 45 9 kW Weights Empty 82 kg Full 402 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1500 L h Raised 35 C 1250 L h Raised 45 C 950 L h Raised 50 C 875 L h Raised 5...

Page 11: ...Output 44 5 kW Weights Empty 82 kg Full 402 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1500 L h Raised 35 C 1250 L h Raised 45 C 950 L h Raised 50 C 875 L h Raised 55 C...

Page 12: ...7 kW Weights Empty 90 kg Full 410 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1700 L h Raised 35 C 1400 L h Raised 45 C 1200 L h Raised 50 C 1100 L h Raised 55 C 1000 L h...

Page 13: ...55 7 kW Weights Empty 90 kg Full 410 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1700 L h Raised 35 C 1400 L h Raised 45 C 1200 L h Raised 50 C 1100 L h Raised 55 C 1000 L...

Page 14: ...tput 57 8 kW Weights Empty 90 kg Full 410 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1700 L h Raised 35 C 1400 L h Raised 45 C 1200 L h Raised 50 C 1100 L h Raised 55 C 1...

Page 15: ...omponents Where the system is not accessible the Rinnai warranty will not cover any additional costs caused by access difficulty The system must be accessible without the use of a ladder or scaffold C...

Page 16: ...rage water heater to reduce the temperature 2 Re plumb the INFINITY gas water heater to the hot water return connection as shown This will reduce the hot water temperature being delivered to approxima...

Page 17: ...other restrictions should not be installed with the relief vent line TPR valve drain line should not be joined to other drain lines Gas connection Check gas type of the Rinnai INFINITY matches the ga...

Page 18: ...reprogrammed contact Rinnai for assistance If hotter water is required the cylinder and the Rinnai INFINITY dip switches will need to be adjusted 8 Plug 3 core flex into suitably earthed general powe...

Page 19: ...installer guide 12949 B 02 19 19 Commissioning Fill the cylinder as detailed on the previous page and commission the Rinnai INFINITY in accordance with the commissioning sheet attached to the front c...

Page 20: ...press warranty period recorded in the table above This warranty does not limit any consumer rights or guarantees that may apply under the Consumer Guarantees Act 1993 If the product is being acquired...

Page 21: ...authorised service centre travel costs shall be the owner s responsibility Warranty exclusions The following exclusions may cause the warranty to become void and will result in a service charge and c...

Page 22: ...tinuous fall of at least 2 from water heater to discharge point Lengths and bends in accordance with the table below Lengths and changes of direction Max length m 9 8 7 6 Max changes of direction grea...

Page 23: ...ith any adjacent soil or waste stack The discharge point of the common stack is such that any discharge is readily visible and will not cause any nuisance The common stack is vented by extending the p...

Page 24: ...Rinnai co nz 0800 746 624 http www youtube com rinnainz http www facebook com rinnainz 12949 B...

Reviews: