Commercial Hybrid System
21
Condensate Connection
(1/2” MNPT)
A Condensate line must be installed to the 1/2” MNPT
connection located at the bottom of the tankless unit.
The condensate line must be routed out of the system
enclose with a downward pitch
Following are two examples on how to rout the
condensate line.
1. Cut a hole in the lower enclosure that will
maintain appropriate pitch of the condensate
line.
2. Route the condensate line out through the
opening locate at the base of the lower enclosure.
3. Reinstall the lower enclosure using the plastic
rivet screws to secure it into place.