Rinnai ASPIRATION RHFE-750ETR Installation Manual Download Page 22

Rinnai Australia

20

ASP Flue Installation Manual

CONNECTING HEATER EXHAUST & AIR SUPPLY

CONNECTING HEATER EXHAUST

  

1.

 Lubricate the O-Ring of the exhaust connection and fit the telescopic exhaust pipe of the heater.

 Push the telescopic tube fully home so that the end of the exhaust connection and the collar of the

telescopic exhaust pipe are fully mated.     

2. Attach the flue locking clamp provided with the heater over the telescopic exhaust pipe and the exhaust

connection of the flue transition. Ensure that the teeth of the flue locking clamp engage both 

 

A

 the collar of

the telescopic exhaust pipe and 

 

B

 the collar of the exhaust connection of the flue transition.   

3.

 Close the clamp to secure both components together.

4. Adjustable the telescopic exhaust pipe to attain the desired position of the heater, 

 DO NOT extend  beyond

the indicator groove.       

5.

 Fix the telescopic exhaust in place with the exhaust lock. 

 The clamp of the exhaust lock is attached to

the telescopic exhaust pipe whilst the finger tabs are secured around the collar of the fixed part of the exhaust.

CONNECTING COMBUSTION AIR HOSE 

This section describes how to connect the exhaust pipe from the
Aspiration heater to the exhaust connection on  flue transition
ASPDFK or ASPKIT03.

 This joint MUST BE properly secured in accordance

with these instructions using the clips provided.

If this joint is not secured properly, products of
combustion could disperse into the room being heated
which may result in a dangerous condition.

The combustion air hose of the heater is attached to the
large diameter combustion air inlet.

  Secure the combustion air hose to the

combustion air inlet with cable tie supplied with
the heater.

The air hose MUST BE properly secured in
accordance with these instructions for safe and
reliable operation of this heater.

The rubber cap (when supplied) is designed to fit
both the left and right hand combustion air inlet
and MUST cover the air inlet not in use.

Exaust Connection

ASPDFK

ASPKIT03

CAUTION

1

2

3

!

Telescopic Exhaust pipe

Exhaust connection

!

!

!

!

!

4

5

!

!

Maximum

limit of telescopic

extension

INCORRECT

over extension

of telescopic

extension

Collar

Collar

!

!

!

!

!

CAUTION

Summary of Contents for ASPIRATION RHFE-750ETR

Page 1: ...urer s Installation Instructions Current AS NZS 3000 AS NZS 3500 AS 5601 Local Regulations and Municipal Building Codes THESE COMPONENTS MUST BE INSTALLED SERVICED AND REMOVED BY AN AUTHORISED PERSON...

Page 2: ...COMPONENTS 3 INSTALLATION CONFIGURATIONS 4 WALL PENETRATIONS 6 FLUE COMPONENTS 7 FLUE COMPONENT ASSEMBLY 8 CREATING A DIRECT FLUE INSTALLATION 8 CREATING A DIRECT EXTENDED FLUE INSTALLATION 9 CREATING...

Page 3: ...RD Denotes items that are not required for the specific installation OBSERVE CORRECT ORIENTATION Where specified ensure that components are installed with the correct vertical or horizontal orientatio...

Page 4: ...ory Regulation Rinnai Energysaver space heaters when correctly installed with Rinnai approved flue components are room sealed appliances and no internal ventilation is required Rinnai Energysaver spac...

Page 5: ...manating from the front of this appliance may over time affect the appearance of some materials used for flooring such as carpet vinyl cork or timber This effect may be amplified if the air in the roo...

Page 6: ...Cowl ASPDFK ESPIPE900 ESBEND ESCONDK ESROOFCOWL Direct Flue Kit 750 Co Ax Pipe 900mm Bend 45 x2 Condensate Trap Wall Terminal Kit ASPDFK ESPIPE900 ESBEND ESCONDK ESWTKIT INTERNAL WALL Components Opti...

Page 7: ...he minimum total length is not to be less than 300mm DIRECT EXTENDED EXTERNAL WALL INTERNAL WALL DIRECT EXTENDED UNDER FLOOR SIDEWAYS SIDEWAYS EXTERNAL WALL DIRECT EXTENDED When cutting the flue trans...

Page 8: ...d Direct Extended flue installations where the flue terminal is located directly to the rear of the appliance If no flue pipe penetration is required the markings are still useful for indicating the c...

Page 9: ...OOFCOWL ESPIPE900 Co ax V erticle Terminal Co ax Pipe Wall Clip Wall Clip Wall Clip Silicon Grease Drain Tube Internal Wall Plate External Wall Plate Flue Terminal Pipe Centring Spacer ESPLATE Externa...

Page 10: ...ed on the raised ring of the flue transition 3 Pass the ASPDFK through the internal wall penetration until the internal wall plate is flush with the wall 4 Create the wall terminal in accordance with...

Page 11: ...page 18 5 Move the heater into place and make the heater exhaust and combustion air hose connections in accordance with the section CONNECTING HEATER EXHAUST AIR SUPPLY on page 20 6 Follow steps 6 th...

Page 12: ...s note that a direct extended flue installation example is illustrated above Slide the internal wall plate over the terminal end of the assembled flue pipe until it is nested on the raised ring of the...

Page 13: ...dance with ASSEMBLING AN ON WALL TERMINAL ESWTKIT ESBEND ESPIPE900 on page 18 8 Move the heater into place and make the heater exhaust and combustion air hose connections in accordance with the sectio...

Page 14: ...heater in accordance with the instructions on page 21 7 Follow steps 6 through 11 from the chapter Heater Installation in the Rinnai ASPIRATION Operation Installation Manual supplied with the heater a...

Page 15: ...ing Direct Creating Direct Extended Flue Installations As Required z Finalise Installation Commissioning Of Heater To prevent accidental or erroneous dislodgement the joints between transition assembl...

Page 16: ...exhaust and combustion air hose connections in accordance with the section CONNECTING HEATER EXHAUST AIR SUPPLY on page 20 10 Follow steps 6 through 11 from the chapter Heater Installation in the Rin...

Page 17: ...outlet and mount the assembled ASPKIT03 components in this location in an downwards vertical manner Activities for creating a Under Floor flue installation a Assemble Flue Adaption Kit 750 ASPKIT03 b...

Page 18: ...from the chapter Heater Installation in the Rinnai ASPIRATION Operation Installation Manual supplied with the heater and complete the installation and commissioning of the heater in accordance with t...

Page 19: ...ONENT ASSEMBLY CONNECTION ESPIPE900 Lubricate O Rings with the supplied O ring grease then fit the female aluminium inner pipe end over the male inner pipe ends of an adjoining component Cutting is no...

Page 20: ...END ESPIPE900 1 Measure off the required terminal length then mark off for cutting allow an additional 50mm for joining to other components Cut the outer pipe at this mark Take care to NOT cut the inn...

Page 21: ...in the section REGULATIONS CLEARANCES GENERAL INFORMATION on page 2 ONLY use PVC cement between externally located joints of PVC pipes to secure and seal these joints against ingress of dust and wate...

Page 22: ...pipe whilst the finger tabs are secured around the collar of the fixed part of the exhaust CONNECTING COMBUSTION AIR HOSE This section describes how to connect the exhaust pipe from the Aspiration he...

Page 23: ...sertion point which is a rubber grommet found at the rear of the heater to the right of the combustion air hose connection Insert the condensate tube through the rubber grommet until you reach the 90...

Page 24: ...624 Address 105 Pavilion Drive Airport Oaks Mangere Manukau PO Box 53177 Auckland Airport Manukau 2150 Phone 09 257 3800 Fax 09 257 3899 Email info rinnai co nz Websites www rinnai co nz and www rinn...

Reviews: