![RightAngle NewHeights 4 Bonita ET Instruction Download Page 8](http://html1.mh-extra.com/html/rightangle/newheights-4-bonita-et/newheights-4-bonita-et_instruction_1460708008.webp)
K&A Manufacturing • 800.298.4351 • www.raproducts.com/install
8 of 12
Step 8
• Install the up/down switch, control box,
and the two J-Channel wire management.
E
A
E
D
H
E
H
H
Step 9
Note:
if you have
a programmable
switch (shown), please refer
to the installation instructions
included with the switch.
Optional:
Programmable
Switch
Switch
Table will
NOT
operate unless the
control box is screwed tight into
the table without any play.