background image

8

OR CASTER

  OR COUNTER-CLOCKWISE TO LOWER IT.  FOLD 

WORKSURFACE TO THE DESIRED HEIGHT AND ANGLE.

THE CRANK HANDLE BACK UNDER THE FIXED WORKSURFACE.  ADJUST THE MOVABLE

6

5

9

WORKSURFACE

7

SUPPORT

STEP 8:  

WITH THE HELP OF AN ASSISTANT, SET THE WORKSTATION UPRIGHT IN ITS

FINAL LOCATION.  LEVEL THE WORKSTATION IF REQUIRED BY TURNING THE LEVELING
GLIDES CLOCKWISE (FROM THE TOP) ON THE LOW CORNERS OF THE UNIT.  IF YOUR
WORKSTATION HAS CASTERS, TURN THE BOLTS AT THE TOP OF THE CASTERS CLOCK-
WISE TO LEVEL THE UNIT.

TO OPERATE:  

DROP THE MOVABLE WORKSURFACE  

11

 USING THE INSTRUCTIONS 

THAT CAME WITH THE SWING ARM  

10

  .  UNFOLD THE CRANK.  TURN IT CLOCKWISE 

TO RAISE THE FIXED WORKSURFACE  

1

LEVELING GLIDE

FOOT

DETAIL A

PRE-INSTALLED
T-SLOT PLATE

STEPS 4-6

6703 ZINSER ST., SCHOFIELD, WI 54476

PHONE: 800.298.4351 FAX: 866.882.9475

www.raproducts.com

VERSION DATED:  3/6/12

K&A MANUFACTURING

PAGE 2 OF 2

STEP 4:  

WITH THE HELP OF AN ASSISTANT, PLACE (4) STAR WASHERS  

6

  ON (4) SOCKET SCREWS  

7

  .  INSERT

THESE THROUGH THE HOLES AT THE ENDS OF THE CROSS SUPPORT  

5

  AND THREAD THEM INTO THE T-SLOT

PLATE THAT IS PRE-INSTALLED IN THE SLOT IN THE COLUMN ASSEMBLIES  

2

  AND  

3

  .  SEE DETAIL A BELOW.  

DO NOT FULLY TIGHTEN.

STEP 5:  

LEVEL THE CROSS SUPPORT  

5

  AT 4" FROM THE BOTTOM OF THE WORKSURFACE  SUPPORT AND FULLY 

TIGHTEN THE SOCKET SCREWS  

7

  .  SEE THE DETAIL BELOW.  

SPECIAL EXCEPTION:  ON WORKSTATIONS ON WHICH 

THE LifeBalance STATION IS BEING INSTALLED, THE CROSS SUPPORT SHOULD BE INSTALLED RESTING ON THE FEET 
OF THE COLUMN ASSEMBLIES TO ALLOW FOR CLEARANCE OF THE EQUIPMENT.

STEP 6:  

ALIGN THE HOLES IN THE WORKSURFACE SUPPORTS WITH THE PILOT HOLES IN THE WORKSURFACE  

1

  .

ATTACH THE WORKSURFACE SUPPORTS TO THE WORKSURFACE USING (16) WOOD SCREWS  

9

  .  DO NOT OVER-

TIGHTEN THE SCREWS.  USE A LOW TORQUE SETTING ON THE DRILL.

STEP 7:  

PLACE THE MOVABLE WORKSURFACE  

11

  ON THE PROTECTED SURFACE IN FRONT OF THE FIXED WORK-

SURFACE  

1

  KEEPING A 1/2" SPACE BETWEEN THE WORKSURFACES.  PLACE THE SWING ARM  

10

  ON THE WORK-

SURFACES.  ALIGN THE HOLES IN THE SWING ARM AND RELEASE PADDLE WITH THE PILOT HOLES IN THE WORK-
SURFACES.  ATTACH THE SWING ARM USING THE INSTRUCTIONS THAT CAME WITH THE ARM.  THE SCREWS ARE 
INCLUDED WTH THE ARM.

(SEE EXCEPTION IN STEP 5)

LOCATING THE CROSS SUPPORT

    

5

BOTTOM OF
WORKSURFACE
SUPPORT

 4.00 

11

10

STEP 7

Reviews: