-
4
-
ME12973A
(14)Connect the adapter cable to the power outlet.
(15)Mount the suction pipe into the cryogenic gas suction. Refer to the Fig.7, the cooling gas
alignment guide must be positioned at the bottom of the suction pipe when switching on the
cryogenic gas suction at the left.
Mount the pipe such that the height from the top to the main body is around 56 mm. (Fig.8)
Fix the suction pipe into the main body using the slotted set screw. (Fig.9)
56 mm
Fig.8 Location of the suction pipe
Cooling gas alignment guide
Fig.7 Installation of suction pipe
Set screw to fix the suction pipe
Fig.9 Fixing the suction pipe
Summary of Contents for XtaLAB mini
Page 4: ......