Blast tube length
The length of the blast tube must be selected according to the indi-
cations provided by the manufacturer of the boiler, it must be great-
er than the thickness of the boiler door complete with its insulation.
The length available, L (inches), is as follows:
For boilers with front flue passes 15)(Fig. 8) or flame inversion
chambers, protective insulation material 13), must be inserted
between the boiler refractory 14) and the blast tube 12).
This protective insulation must not compromise the extraction
of the blast tube.
For boilers having a water-cooled front, the insulation 13)-14)
is not required unless it is required by the boiler manufacturer.
4.5
Securing the burner to the boiler
Detach the combustion head from the burner (Fig. 8):
loosen the four screws 3) and remove the cover 1);
disengage the swivel joint 7) from the graduated sector 8);
remove the screws 2) from the slide bars 5);
remove the two screws 4) and pull the burner back on slide
bars 5) by about 4”;
disconnect the wires from the flame rod and the electrode and
then pull the burner completely off the slide bars.
Model
L
(short blast tube)
RS 190/M
14
31
/
32“
Fig. 8
D2434
Prepare a suitable lifting system.
The manufacturer declines
any and every re-
sponsibility
for any possible lifting movements,
different from those indicated in
this manual.
WARNING
The seal between burner and boiler must be air-
tight.