20045701
14
Installation
4.8
Boiler fixing
³
Put on the flange 1)(Fig. 8) the screw and two nuts.
³
Fix the flange 1)(Fig. 9) to the boiler door 4) using screws 2).
³
If necessary, the nuts 3)(Fig. 9) interposing the insulating gas-
ket 5).
Fig. 8
1
E9095
5
1
E9094
2
4
3
Fig. 9