![Riello INSIEME EVO 25 Installation And Maintenance Manual Download Page 20](http://html1.mh-extra.com/html/riello/insieme-evo-25/insieme-evo-25_installation-and-maintenance-manual_1459353020.webp)
20
INSTALLATION
2.11.3
Emptying
Before draining the boiler:
− Turn the mains power switch OFF and turn the control
panel function selector to (
0
).
− Close the water supply shut-off cocks;
− To empty the boiler, connect a rubber hose (Øint=12mm)
to the hose union on the boiler's drain cock (1), then
open the cock.
1
2