![Riello G 24 Manual Download Page 13](http://html1.mh-extra.com/html/riello/g-24/g-24_manual_1459484013.webp)
Installation Description
Installation, start up and maintenance must be carried out by qualified and skilled personnel.
All operations must be performed in accordance with the technical handbook supplied with the burner.
BURNER SETTING
PRESS G24
X
After drilling the boilerplate, using the supplied gasket as a template, fix the flange of burner to the boiler.
X
Dismantle the blast tube from the burner and install the nozzles, choosing these on the basis of the
maximum boiler output and following the diagrams included in the burner instruction handbook.
X
Check the position of the electrodes.
X
Adjust the combustion head and refit the blast tube to the burner casing.
X
Install the burner to the flange.
PRESS GV
X
The PRESS GV model has slide bars, for easier installation and maintenance.
X
After drilling the boilerplate, using the supplied gasket as a template, dismantle the blast tube from the
burner and fix it to the boiler.
X
Adjust the combustion head.
X
Refit the burner casing to the slide bars.
X
Install the nozzle, choosing this on the basis of the maximum boiler output and following the diagrams
included in the burner instruction handbook.
X
Check the position of the electrodes.
X
Close the burner, sliding it up to the flange.
HYDRAULIC AND ELECTRICAL CONNECTIONS AND START-UP
X
The burners are supplied for connection to two pipes fuel supply system.
X
Connect the ends of the flexible pipes to the suction and return pipework using the supplied nipples.
X
Make the electrical connections to the burner following the wiring diagrams included in the instruction
handbook.
X
Prime the pump by turning the motor.
X
On start up, check:
- Pressure pump (to max. and min.)
- Combustion quality, in terms of unburned substances and excess air.
13
Summary of Contents for G 24
Page 18: ...PRESS GV Series One Stage Light Oil Burners NOTES 18...
Page 19: ...NOTES 19...