INSTALLATION

ENGLIS

H

2.6 

Electrical connections

The 

BAG

3

 is prearranged with rubber cable feed-throughs (1) located 

in the top section of the box allowing wiring to be passed through.

1

3

4

Below is an explanation of how to correctly connect the 

BAG

3

 on 

the boiler and on devices.

 

9

Before carrying out any electrical intervention, set the main 

system switch to "off".

Connecting the BAG

3

 to the electrical power supply

 

− Pass the cable (2) which comes out of the electrical con-

nection box (3) through the cable feed-through (1) and 

connect it to the electrical power supply (phase-neutral-

earth) making sure not to connect it below the boiler fuse.

1

2

3

Access to the BAG

3

 connection terminals

 

− To access the 

BAG

3

 

connection terminals, loosen the four 

screws (4) and remove the cover (3).

1

3

4

Connecting the BAG

3

 to the ambient thermostats/chrono-thermostats

 

− Carry out the connections of the ambient thermostats (TA) 

and/or chrono-thermostats (CT) of each zone, as indicat-

ed in the diagram below. Before connection, eliminate 

the relative jumper (TA1,TA2 or TAt3).

2

4

5

1

Cavo ingresso

di rete 230V

3

TA2 nero

TA1 rosso

nero

rosso

marrone

marrone

TA3 grigio

grigio

marrone

grigio

grigio

marrone

marrone

TA3 dopo aver

rimosso

ponticello

GRIGIO

in morsettiera

TA1 dopo aver

rimosso

ponticello

ROSSO 

in morsettiera

TA2 dopo aver

rimosso

ponticello 

NERO

in morsettiera

BAG

3

 2 MIX BASIC

 

9

2

4

5

1

Cavo ingresso

di rete 230V

3

blu

TA1 rosso

rosso

rosso

marrone

TA3 grigio

rosso

grigio

marrone

grigio

grigio

marrone

blu

rosso

rosso

blu

rosso

nero

TBT 1

TA3 dopo aver

rimosso

ponticello

GRIGIO

in morsettiera

TA1 dopo aver

rimosso

ponticello

ROSSO 

in morsettiera

BAG

3

 MIX BASIC

The ambient thermostats (TA) and/or chrono-thermostats 

(CT) of the low and high temperature systems must be con-

nected directly to the 

BAG

3

 using a cable with a minimum 

section of 1 mm

2

.

 

9

The load represented by the pump will weigh directly on the 

corresponding ambient thermostat (TA) and/or chrono-ther-

mostat (CT), therefore the TA and/or CT contact must be adapt-

ed to the application and be compatible with the electrical 

rate of the pump not less than 6A (230Vac-50Hz).

Connecting the BAG

3

 to the boiler

 

− Connect the 

CONNECT LE

 to the boiler (GEN) as indicated in 

the diagram below.

 

9

nero

nero

marrone

blu

marrone

Fusibile 3.15A F

g/v

blu

g/v

marrone

blu

INGRESSO RICHIESTA

CALORE

CALDAIA o GENERATORE

Connect the mammut (B-B) of the 

BAG

3

 to the mammut (TA) 

of the boiler using a cable with a minimum section of 2x0.5 

mm

2

 (please refer to the wiring diagram in the instruction 

booklet for the installer of the specific boiler).

 

9

When using a phase-phase power supply, use a tester to 

determine which of the two wires has the greater potential 

compared to the earth and connect it to the L terminal. Con-

nect the remaining wire to the N terminal.

 

9

For floating power supplies, i.e. those which have no earth 

connection, an insulation transformer must be used with a 

secondary unit connected to the earth.

 

9

It is mandatory:

 

− to use a multi-pole trip-switch to disconnect the line in 

compliance with CEI-EN standards (contact opening at 

least 3 mm)

 

− to use cables with a 1.5 mm

2

 section and respect the L 

(phase) - N (neutral) connection

 

− that the amperage on the switch is adequate for the boil-

Summary of Contents for BAG3 2 MIX BASIC

Page 1: ...rev 4 08 2015 ITALIANO ENGLISH BAG3 MIX BASIC IT ISTRUZIONI PER L INSTALLATORE E PER IL SERVIZIO TECNICO DI ASSISTENZA EN INSTRUCTIONS FOR THE INSTALLER AND FOR TECHNICAL ASSISTANCE BAG3 2 MIX BASIC B...

Page 2: ...95 CE PER L UTENTE 0 0AVVERTENZA PER L UTENTE questo dispositivo non necessi ta di alcuna regolazione o controllo da parte dell utente pertanto vietato aprire il coperchio frontale del dispositivo 9...

Page 3: ...si avverte odore di com bustibile o di incombusti In questo caso aerare il locale aprendo porte e finestre chiudere il dispositivo d intercettazione combustibile fare intervenire con sollecitudine il...

Page 4: ...1 12 14 13 1 3 2 4 5 6 7 1 Rubinetto di scarico 2 Bottiglia di miscela 3 Circolatore impianto bassa temperatura 1 4 Circolatore impianto alta temperatura 5 Valvola di non ritorno interna alla tubazion...

Page 5: ...dell impianto 9 9Provvedere a sigillare i fori di passaggio dei tubi di collega mento dal BAG3 alla caldaia 1 6 Dati tecnici 1 7 Attacchi idraulici Le caratteristiche degli attacchi idraulici sono le...

Page 6: ...mento depositi e o re sidui possono impedirne la libera rotazione 0 0 vietato far funzionare i circolatori senza acqua 9 9Nel caso in cui fossero presenti nel circuito in bassa tempe ratura dei dispos...

Page 7: ...rosso blu grigio marrone blu g v marrone g v marrone g v marrone grigio grigio marrone marrone blu blu rosso rosso nero nero blu blu rosso nero TBT 1 nero TBT 2 rosso TA3 dopo aver rimosso ponticello...

Page 8: ...one 6 21 marrone 3 11 marrone 4 14 marrone rosso blu grigio marrone blu g v marrone g v marrone grigio grigio marrone blu rosso rosso blu blu rosso nero TBT 1 g v P1 blu marrone g v P3 blu marrone TA3...

Page 9: ...ericolo 2 2 Dimensioni e pesi L P H BAG3 MIX BASIC 2 MIX BASIC L 400 P 160 H 720 Peso netto box 8 Peso netto frutto 15 18 Il box un accessorio che viene fornito separatamente su richiesta 2 3 Installa...

Page 10: ...are le tubazioni 6 e 7 sugli attacchi 6a e 7A posti sulla bottiglia di miscela interponendo le apposite guarnizioni di tenuta fornite a corredo Inserire il i termometro i T1 T2 all interno della propr...

Page 11: ...00 2 5 Schema di principio installazione tipica Caldaia TA 230V 50Hz IBT2 zona 2 IAT zona 3 IBT1 zona 1 TA CT1 TA CT2 TA CT3 TA Connessione termostato ambiente TA CT1 Termostato ambiente cronotermosta...

Page 12: ...morsettiera I termostati ambiente TA e o cronotermostati CT dell impianto a bassa e alta temperatura devono essere collegati direttamente al BAG3 utilizzando un cavo con sezione minima di 1 mm2 9 9Il...

Page 13: ...l albero motore LED rosso acceso LED 4 giallo acceso Bassa tensione in ingresso Solo avviso Il circolatore continua a funzionare Verificare la tensione in ingresso LED rosso acceso LED 3 giallo acces...

Page 14: ...giallo LED 4 giallo LED 5 giallo Prevalenza proporzionale Il circolatore lavora in funzione della domanda di calore dell im pianto Il punto di lavoro del circolatore e la curva di prevalenza proporzio...

Page 15: ...Nel caso di macchie tenaci inumidire il panno con miscela al 50 di acqua ed alcool denaturato o con prodotti specifici Terminata la pulizia asciugare accuratamente 0 0Non usare prodotti abrasivi benzi...

Page 16: ...lectromagnetic Compatibility EMC Directive 2004 108 EC Low Voltage Directive 2006 95 EC FOR THE USER 0 0INSTRUCTIONS FOR THE USER this device does not require any adjustment or checks to be carried ou...

Page 17: ...nces etc if you smell fuel or burning Should this occur ventilate the room by opening the doors and windows close the fuel shut off device immediately call the r Technical Assistance or a pro fessiona...

Page 18: ...MIX BASIC BAG3 MIX BASIC 8 8 9 10 11 12 14 13 1 3 2 4 5 6 7 1 Drain cock 2 Mixing bottle 3 Circulation unit low temperature system 1 4 Circulation unit high temperature system 5 Non return valve insid...

Page 19: ...he BAG3 to the boiler are sealed 1 6 Technical data 1 7 Plumbing connections The characteristics of the plumbing connections are as follows Ec Boiler inlet 3 4 Uc Boiler outlet 3 4 Md High temperature...

Page 20: ...culation units rotate This is necessary because especially after lengthy pe riods of inactivity deposits and or residue may stop it rotat ing freely 0 0Do not run the circulation unit without water 9...

Page 21: ...o blu grigio marrone blu g v marrone g v marrone g v marrone grigio grigio marrone marrone blu blu rosso rosso nero nero blu blu rosso nero TBT 1 nero TBT 2 rosso TA3 dopo aver rimosso ponticello GRIG...

Page 22: ...the numbered sequence shown in the figure 1 9 2 BAG3 MIX CLIMA wiring diagram 2 4 5 6 GI VE BL MR GI VE 7 1 MR GR GR RS MR GI VE GI VE GI VE GI VE BL BL BL BL BL BL BL BL MR MR RS MR MR 3 A2 GR A1 BL...

Page 23: ...sions and weights L P H BAG3 MIX BASIC 2 MIX BASIC W 400 D 160 H 720 Net weight of box 8 Net weight of appliance 15 18 The box is supplied separately on request as an accessory 2 3 Installation inside...

Page 24: ...ouplings 6a and 7A located on the mixing bottle and positioning the desig nated seals supplied Insert the thermometer s T1 T2 inside the seat 1 T2 6 6a 7 7a T1 Using the designated clips secure the th...

Page 25: ...itself Boiler 350 250 1000 2 5 Typical installation layout Boiler TA 230V 50Hz IBT2 zone 2 IAT zone 3 IBT1 zone 1 TA CT1 TA CT2 TA CT3 TA Thermostat connection TA CT1 Thermostat chrono thermostat zon...

Page 26: ...osso nero TBT 1 TA3 dopo aver rimosso ponticello GRIGIO in morsettiera TA1 dopo aver rimosso ponticello ROSSO in morsettiera BAG3 MIX BASIC The ambient thermostats TA and or chrono thermostats CT of t...

Page 27: ...Operation at minimum 0 25 Green LED on 2 yellow LED on Operation at minimum average 25 50 Green LED on 3 yellow LED on Operation at average maximum 50 75 Green LED on 4 yellow LED on Operation at max...

Page 28: ...4 yellow LED 5 yellow LED 1 green LED 2 yellow LED 3 yellow LED 4 yellow LED 5 yellow LED 1 green LED 2 yellow LED 3 yellow LED 4 yellow LED 5 yellow Proportional head Constant curve Constant head Cu...

Page 29: ...born stains use a cloth with a 50 water and denatured alcohol mixture or use specific products Dry carefully after cleaning 0 0Do not use abrasive products benzene or trichloroethylene 4 2 Draining th...

Page 30: ......

Page 31: ......

Page 32: ...atteristiche estetiche e di mensionali i dati tecnici gli equipaggiamenti e gli accessori possono essere soggetti a variazione RIELLO S p A 37045 Legnago VR Tel 0442630111 Fax 044222378 www riello it...

Reviews: