2.4
Minimum distances
The figure shows an example of a typical installation of the
BAG
3
.
N.B.:
For the installation of any cocks, (not supplied), a niche
must be formed of a sufficient size to allow them to be fitted
below the
BAG
3
itself.
Boiler
350
250
1000
2.5
Typical installation layout
Boiler
TA
230V~50Hz
IBT2
zone 2
IAT
zone 3
IBT1
zone 1
TA-CT1
TA-CT2
TA-CT3
TA
Thermostat connection
TA-CT1
Thermostat/chrono-thermostat zone 1 LOW
temperature
TA-CT2
Thermostat/chrono-thermostat zone 2 LOW
temperature
TA-CT3
Thermostat/chrono-thermostat zone 3
HIGH temperature
IBT1
Mixing system 1 LOW temperature
IBT2
Mixing system 2 LOW temperature
IAT
Direct system HIGH temperature