20032189
26
GB
Maintenance
9.3
Opening the burner
For opening the burner, loosen the screws that secure the cover
and proceed with the maintenance operation.
9.4
Closing the burner
Refit following the steps described but in reverse order; refit all
burner components as they were originally assembled.
DANGER
Disconnect the electrical supply from the burner
by means of the main system switch.
DANGER
Close the fuel shut-off valve.
Wait for the components in contact with heat
sources to cool down completely.
After carrying out maintenance, cleaning or
checking operations, reassemble the cover and
all the safety and protection devices of the burner.
Summary of Contents for 40 G7
Page 2: ...Istruzioni originali Translation of the original instructions...
Page 32: ......
Page 62: ......
Page 63: ......