23
20032189
GB
Start-up, calibration and operation of the burner
8.6.1
Maintenance position
Access to the combustion head, diffuser disc / electrodes
unit and nozzle
Proceed as follows:
remove the burner out of the boiler, after loosing the fixing
nut to the flange;
hook the burner to the flange 1), by removing the combus-
tion head 2) after loosing the fixing screws 3);
remove the diffuser disc-holder assembly 9) from the noz-
zle-holder 8) after loosing its fixing screw;
screw the nozzle 10).
After carrying out maintenance, cleaning or
checking operations, reassemble the cover and
all the safety and protection devices of the burner.
Fig. 22
4
1
D8057
D8056
2
3
5
6
Summary of Contents for 40 G7
Page 2: ...Istruzioni originali Translation of the original instructions...
Page 32: ......
Page 62: ......
Page 63: ......