20175134
26
GB
Installation
5.11.2 Gas train
Approved according to standard EN 676 and provided separately
from the burner.
To select the correct gas train model, refer to the supplied "Burn-
er-gas train combination" manual.
5.11.3 Gas train installation
DANGER
Disconnect the electrical power using the main
switch.
Check that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Make sure that the gas train is properly installed
by checking for any fuel leaks.
The operator must use the required equipment
during installation.
Fig. 25
20110504
Summary of Contents for 20166004
Page 2: ...Translation of the original instructions ...
Page 46: ...20175134 44 GB Appendix Electrical panel layout ...
Page 49: ...47 20175134 GB Appendix Electrical panel layout ...
Page 50: ...20175134 48 GB Appendix Electrical panel layout ...
Page 51: ...49 20175134 GB Appendix Electrical panel layout 0 ...
Page 52: ...20175134 50 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 30 3 3 0 0 1 0 ...
Page 53: ...51 20175134 GB Appendix Electrical panel layout 0 1 1 1 2 ...
Page 59: ......