
9
311
1 7 0
41
2 1 8
2 0 8
75
Lato SUPERIORE della CALDAIA
Lato ANTERIORE della CALDAIA
Lato SUPERIORE della CALDAIA
Lato FRONTALE della CALDAIA
Lato FRONTALE della CALDAIA
Pannellatura LATERALE
Pannellatura SUPERIORE
Lato ANTERIORE della CALDAIA
LATERALE della CALDAIA
LATERALE della CALDAIA
RIELLOtech PRIME
control panels can be installed either on the top of the boiler or on one of its side panels. Before
commencing installation, check the arrangement of the holes on the top panel or side panel of the boiler.
Once you have identified the right holes for the type of installation required, proceed as follows:
- Push out the pre-formed slots on the boiler casing corresponding to the oval cable grommets in the control panel
- Perforate the membranes of the control panel cable grommets. Pull out the thermostat cable and route it through the
slot in the top panel
- Secure the control panel to the boiler casing.
ASSEMBLY
TOP of boiler
FRONT
of boiler
SIDE of boiler
FRONT
of boiler
SIDE of boiler
SIDE panels
TOP panels
FRONT of boiler
FRONT of boiler
TOP of boiler
Summary of Contents for 20010820
Page 1: ...CONTROL PANEL RIELLOtech PRIME INSTALLATION OPERATION AND MAINTENANCE MANUAL...
Page 18: ...18...
Page 19: ......