Slide 20
Parts Replacement Hierarchy
This flow chart
describes the order in
which the parts need
to be removed for
replacements/
maintenance from the
top.
The higher the level,
the lesser the parts,
and vice versa.
w_y058m0152
Keypad
board
Top cover
unit
Lens
cap
Lamp
cover
Adjustable
foot
Lamp
module
Lamp
housing
Optical
system
unit
Speaker
Start
IR sensor
board
Control
panel
Zoom ring
Lamp cable
Top cover
Base
System fan
Blower fan
FFC cable
Interlock
switch
LVPS
LVPS cable
LVPS
Thermistor
Optical
engine /
Main board
assembly
Focus
ring
IO cover
/IO seal
Photo
sensor
board
DMD
fan
Color
wheel
Summary of Contents for KW5708
Page 1: ...Slide 1 Y0AS Y0AT Y0AV Y0AY Y0AZ Y0B0 Y0BC Service Training Mizar PJ2 Version 1 0...
Page 10: ...Slide 10 10 Overview External View...
Page 11: ...Slide 11 11 Overview Connection Ports...
Page 12: ...Slide 12 Operation Panel...
Page 17: ...Slide 17 Service Training Basic Points about Service...
Page 22: ...Slide 22 LED Display...
Page 27: ...Slide 27 Replacing the Color Wheel Avoid touching the glass parts of the color wheel...
Page 29: ...Slide 29 Rod Adjustment Adjust if there are yellowish or bluish parts in the image...
Page 32: ...Slide 32 Service Training Updating Firmware...
Page 35: ...Slide 35 Background Information Types of Projectors...
Page 42: ...Slide 42 Background Information Polarization...
Page 47: ...Slide 47 Background Information Terms and Definitions...
Page 59: ...Slide 59 Throw Ratio Throw Ratio PD SW...
Page 61: ...Slide 61...