Operation 

7.1  Initial commissioning 

Normally,  the  valves  have  been  tested  for  leaks  with 
water.  

 

Unless  otherwise  agreed  there  could  be 
residual amounts of water in the flow section 
of  the  valve.  This  could  result  in  a  possible 
reaction with the medium. 

To  prevent  leaks,  all  connection  screws  should  be 
retightened  after  the  initial  loading  of  the  valve  with 
operating  pressure  and  operating  temperature.  See 

Section 1.3

 
 

7.2  Shutdown  

  The  local  regulations  are  to  be  observed  when 

dismantling the valve. 

 

Prior  to  undoing  the  flange  connection 
ensure,  that  the  plant  is  depressurised  and 
emptied. 

  Prior to starting any repair work, the valve is to be 

thoroughly cleaned. Medium residue may be in the 
valve  even  if  it  has  been  properly  drained  and 
flushed.  

  After  dismantling,  immediately  protect  the  valve 

flanges  against  mechanical  damage  by  using 
flange caps. See also 

Section 6.4

 
 

 

7.3  Recommissioning 

When  recommissioning  the  valve,  make  sure  that  all 
the  appropriate  steps  as  described  in 

Section  6.1  to 

6.7

 and 

Section 7.1

 are repeated. 

 

 

7.4  Improper operation and their  

consequences 

 

Fig. 7

 

 

  The  test  pressure,  checked  by  the  manufacturer, 

an approved authority or the supervisory company 
responsible  is  secured  against  unauthorised  ad-
justment by a lead seal. 

  A broken lead seal must be replaced without delay. 

This  can  either  be  done  by  the  manufacturer,  the 
approved  authority  or  the  supervisory  company 
responsible. 

 

It  is  emphasised  that  in  the  case  of 
the  operating  company  adding  the 
lead 

seal  itself,  it 

automatically 

assumes  full  responsibility  for  any 
operational 

hazard 

and 

resulting 

damage. 

  The travel set at the manufacturer's works ensures 

reliable  operation  of  the  valve.  It  is  forbidden  to 
arbitrarily  alter  the  travel  or  to  totally  block  the 
valve. 

  During  operation  of  the  valve,  no  hard  foreign 

matter  may  be  found  between  the  seat  and  the 
plug of the valve.  

  If  foreign  matter  is  deposited  on  the  sealing 

surfaces during reseating of the valve, the valve is 
probably  not  tight.  Damage  may  also  occur  to  the 
plastic sealing surfaces. 

 

Lead seal 

Summary of Contents for GUT/F Series

Page 1: ...erved before transport installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9530 021 en...

Page 2: ...ion forces 9 6 3 Valve connecting dimensions 9 6 4 Flange caps and gaskets 9 6 5 Direction of flow and installation position 9 6 6 Grounding 9 6 7 Installation 9 7 Operation 10 7 1 Initial commissioni...

Page 3: ...300 raised face Materials Body material Ductile cast iron EN JS 1049 ASTM A395 Lining material PFA PTFE F On request antistatic PFA L F L highly permeation resistant F P Ultrapure PFA HP F HP Bellows...

Page 4: ...o ASME Class 300 Flange Nominal size screws Tightening torque mm inch ASME Nm in lbs 25 1 4 x 15 133 Cover screws ISO DIN Flange Nominal size screws Tightening torque mm inch ISO DIN Nm in lbs 25 1 4...

Page 5: ...ve a corrosion resistant plastic lining Solids can lead to increased wear damage to sealing surfaces or to a reduction in the service life of the valve The overflow valves are set at the works to the...

Page 6: ...the valve must be completely filled with medium at all times or else a potentially explosive atmosphere must be excluded by superimposing a layer of inert gas b Discharges outside the valve At the poi...

Page 7: ...a dry vibration free and well ventilated room at as constant a temperature as possible In general a storage period of 10 years should not be exceeded Store the valve in an upright position and secure...

Page 8: ...s of flow 6 2 Sizing of the outlet line Outlet lines are to be sized so that reliable functioning of the valve is ensured under all expected operating conditions The medium is to be discharged so that...

Page 9: ...e of metal or enamel can be damaged use PTFE lined seals with a metal inlay These gaskets are available as special accessories in the Richter range 6 5 Direction of flow and installation position Qqq...

Page 10: ...ssioning When recommissioning the valve make sure that all the appropriate steps as described in Section 6 1 to 6 7 and Section 7 1 are repeated 7 4 Improper operation and their consequences Fig 7 The...

Page 11: ...re vessels VBG 17 32 and TRD 601 sheet 2 paragraph 3 4 The intervals for regular checks are to be laid down by the customer in line with the operating conditions All repair work is to be performed by...

Page 12: ...plug and seat Unscrew cap 207 Undo groove nut 509 1 Undo straining screw 581 Do not turn the entire stem 800 There is a risk of the insert sleeve 308 being unscrewed out of the bellows 206 or the fold...

Page 13: ...ciation of the German Technical Supervi sory Boards All pressure tests should be carried out in compliance with DIN EN 12266 1 or API 527 It is recommended to perform a bubble test with a 5 mm diamete...

Page 14: ...Series GUT F Page 14 9530 021 en Revision 16 TM 10477 Edition 05 2022 10 2 Sectional drawing...

Page 15: ...EN 1092 2 type B ISO 7005 2 Type B PN 16 or flanges drilled to ASME B16 5 Class 150 Flanges acc to ASME B16 5 Class 150 or 300 raised face Nominal size EN 558 series 1 ANSI ISA 75 08 01 Class 150 ANSI...

Page 16: ......

Page 17: ......

Page 18: ...om T V S d Industrie Service GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the leakage rate La S 10 4 mg s...

Page 19: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Page 20: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Page 21: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Page 22: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Reviews: