ASSEMBLY INSTRUCTIONS · ASSEMBLY INSTRUCTIONS · ASSEMBLY INSTRUCTIONS
RICHTER SPIELGERÄTE GMBH · D-83112 FRASDORF · PHONE +49-8052/17980 · FAX 4180
Page 3
5. Attach the two remaining stand posts
and screw together according to
detailed diagram B
. Re-galvanise
protruding threads using galvanising
spray, if necessary.
6. Place the swing frame into the
foundation holes and align the
equipment.
7. Fill the foundation holes with concrete,
tamp and round the edges.
Please take
into account the special sheet: Notes
on the construction of foundations.
Cover the foundations up to ground level
with surfacing material.
Note:
Do not assemble the swallow´s
nest before the concrete has set.
(6.14720 En-EN)
detailed diagram B
detailed diagram B
5
5
concrete
surfacing material
6
7
7