background image

ASSEMBLY INSTRUCTIONS · ASSEMBLY INSTRUCTIONS · ASSEMBLY INSTRUCTIONS

RICHTER SPIELGERÄTE GMBH · D-83112 FRASDORF · PHONE +49-8052/17980 · FAX 4180

Page 3

5.  Attach the two remaining stand posts 

and screw together according to 

detailed diagram B

. Re-galvanise 

protruding threads using galvanising 

spray, if necessary. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.  Place the swing frame into the 

foundation holes and align the 

equipment. 

 

 

 

 

 

 

 

7.  Fill the foundation holes with concrete, 

tamp and round the edges. 

Please take 

into account the special sheet: Notes 

on the construction of foundations.

 

Cover the foundations up to ground level 

with surfacing material. 

Note:

 Do not assemble the swallow´s 

nest before the concrete has set. 

 

 

(6.14720 En-EN)

detailed diagram B

detailed diagram B

5

5

concrete

surfacing material

6

7

7

Reviews: