ASSEMBLY INSTRUCTIONS · ASSEMBLY INSTRUCTIONS · ASSEMBLY INSTRUCTIONS
RICHTER SPIELGERÄTE GMBH · D-83112 FRASDORF · PHONE +49-8052/17980 · FAX 4180
Page 2
Recommended assembly tools and materials
set of carpenter's tools
set of ratchets
set of spanners
Torx inserts T 20, 25, 30, 40, 50
rubber mallet
Attention!
During the assembly period (including the setting
of the concrete) it is not allowed to play on or put
any weight on the equipment in order to secure
stability during use after the assembly. Standard
concrete requires at least 2 weeks to set.
Sequence of assembly operations
1. Locate the site and take into account
the space required, including the safety
distances, according to the ground plan
on page 1.
2. Start surveying at the point of reference
and dig out the foundation holes.
3. Place two stand posts in front of the
foundation holes (posts are marked) and
insert the foundation irons into the holes
of the steel feet.
4. Assemble bolts, washers, posts and
cross beam according to
detailed
diagram A
.
(6.14720 En-EN)
detailed diagram A
detailed diagram A
2
3
3
4
4
excavation