![Rice Lake Benchmark LP Installation Manual Download Page 12](http://html1.mh-extra.com/html/rice-lake/benchmark-lp/benchmark-lp_installation-manual_1454119012.webp)
8
Benchmark LP Manual
7. Position load cells with capacity label and
load cell wires facing up, and loosely install
the hex head cap screws (provided).
8. Route the load cell cables along the frame to
the summing board.
9. Secure the cable in position with the
adhesive-backed cables tied supplied in the
h a r d w a r e k i t . S e e F i g u r e 4 - 2 f o r a n
illustration of load cell and cable placement.
NOTE:
Do not cut load cell cables.
Figure 4-2. Load cell and wire placement
10. Corner correction trimming and calibration is
necessary after load cell replacement. Follow
t h e i n s t r u c t i o n s i n S e c t i o n 3 . 2 a n d
Section 3.3.
4.3.1
Load Cell Wiring to Summing Board
The four load cells are each wired to their respective
terminals in the summing board according to the
corner numbering system shown in Figure 4-3 and the
coloring code in Table 4-1.
3
4
1
2
Hole for homerun cable
Figure 4-3. Corner numbering (top view)
Table 4-1. Load Cell Wiring
Cable Color Code
Summing Board Terminal
Green
+ Excitation
Black
- Excitation
White
+ Signal
Red
- Signal
4.4
Replacement Load Cells
Table 4-2. Replacement load cells
Capacity of Scale
Load Mount
Load Cell
100 lbs
96823
100272
250 lbs
96824
104645
500 lbs
96825
100273
1000 lbs
96826
100274