Installation
5
2.2
Physical Connections for Installed Boards
The indicator enclosure must be opened to connect cables and set DIP switches for the Remote I/O interface.
Ensure power to the indicator is disconnected, then place the indicator face-down on an antistatic work mat.
Remove the screws that hold the backplate to the enclosure body, then lift the backplate away from the enclosure
and set it aside.
Use a wrist strap to ground yourself and protect components from electrostatic discharge (ESD)
when working inside the indicator enclosure.
The Remote I/O interface board (see Figure 2-1) is mounted on brackets above the indicator CPU board.
Connections between the two boards are as follows:
•
Ribbon cable from connector J15 on the indicator CPU/power supply board (see Figure 2-5 on page 5) to
connector J1 on the Remote I/O board.
•
Serial communications wiring from the indicator EDP port on connector J4 to connector J4 on the
Remote I/O board.
Once wiring and DIP switch configuration (see Section 2.3) are complete, position the backplate over the
indicator enclosure and reinstall the backplate screws. Use the torque pattern shown in Figure 2-3 on page 3 to
prevent distorting the backplate gasket. Torque screws to 10 in-lb (1.13 N-m).
Figure 2-5. IQ plus 510/710 CPU and Power Supply Board
!
Caution
LOCATION OF INSTALLED ANALOG OUTPUT MODULE
100
76
75
51
50
26
25
1
JP4
J9
J6
1
J15
+
+
+
T1
J4
B1
J10
U16
EPROM
SW1
J1
J8
J7
GND
RS485-B
RS485-A
GND
+5V
+I
–I
7
6
5
4
3
2
1
SERIAL COMMUNICA
TIONS - 2
+20 mA
–20 mA
Prn RxD
Prn TxD
EDP RxD
GND
EDP TxD
7
6
5
4
3
2
1
SERIAL COMMUNICA
TIONS - 1
J12
–EXC
+EXC
SHIELD
–SENSE
+SENSE
–SIG
+SIG
7
6
5
4
3
2
1
LOAD CELL CONNECTOR
F2
F1
P2
JP3
JP1
JP2
J5
ANALOG OUTPUT
KEYPAD CONNECTOR
BLUE WIRE
BROWN WIRE
TO LINE FILTER
DI6
DI5
DI4
DI3
DI2
DI1
GND
7
6
5
4
3
2
1
10
9
8
GND
DI8
DI7
DIGIT
AL INPUT
DO6
DO5
DO4
DO3
DO2
DO1
GND
7
6
5
4
3
2
1
10
9
8
+5V
DO8
DO7
DIGITAL OUTPUT
4
3
2
1
J1
IQ plus 710 only
Ribbon cable power connection to
J1 on Remote I/O board
1
DISCONTINUED