10
10
Measurements in mm
INSTALLATION PLAN FOR METALLIC PIT
1
TREAD LAVEL
GRAVEL
COUNTERFRAME
TO LEVEL
FLEXIBLE
SHEATH Ø 40
METALLIC PIT
FOUNDATION CLAMPS
FLEXIBLE SHEATH Ø 40
2
1
REFERENCE FOR THE DIRECTION OF
THE COUNTERFRAME INSTALLATION
TRAFFIC
WAY
CONCRETE
G
B